James J. Bailey, III and New 90 LLC v. Energen Resources Corporation, Successor in Interest to Minatome Corporation and Total Minatome Corporation, Chevron U.S. A., Inc., Successor in Interest to Chevron Oil Company and California company, Southern Natural Gas Company, LLC, successor in Intere
Also decided on this docket: La. Ct. App. 1st Cir., June 21, 2024; La. Ct. App. 1st Cir., April 19, 2024
James J. Bailey, III and New 90 LLC v. Energen Resources Corporation, Successor in Interest to Minatome Corporation and Total Minatome Corporation, Chevron U.S. A., Inc., Successor in Interest to Chevron Oil Company and California company, Southern Natural Gas Company, LLC, successor in Intere, No. 2023CA0564 (La. Ct. App. 1st Cir. Dec. 11, 2024).
Authorities cited
Identified automatically; this list may not be exhaustive.
- 390 So. 3d 378 not in our corpus
- 330 So. 3d 674 not in our corpus
- 330 So. 3d 614 not in our corpus
- 380 So. 3d 38 not in our corpus
- 379 So. 3d 1265 not in our corpus
- 365 So. 3d 851 not in our corpus
- 391 So. 3d 751 not in our corpus
- 391 So. 3d 1126 not in our corpus
- 347 So. 3d 684 not in our corpus
- 329 So. 3d 1112 not in our corpus
- 293 So. 3d 1209 not in our corpus
- 340 So. 3d 236 not in our corpus
- 336 So. 3d 82 not in our corpus
- First National Bank, USA v. DDS Construction, LLC 91 So. 3d 944
- MJ Farms, Ltd. v. Exxon Mobil Corp. 998 So. 2d 16
- State v. Louisiana Land & Exploration Co. 110 So. 3d 1038
- 339 So. 3d 1163 not in our corpus
- 382 So. 3d 271 not in our corpus
- 370 So. 3d 1062 not in our corpus
- State v. Louisiana Land & Exploration Co. 85 So. 3d 158
- 316 So. 3d 482 not in our corpus
- 312 So. 3d 588 not in our corpus
Opinion text
VNI
FIRST CIRCUIT
NO. 2023 CA 0564
LOUISIANA WETLANDS, LLC,
AND NEW 90, LLC
VERSUS
ENERGEN RESOURCES CORPORATION5
CHEVRON USA,
SOUTHERN NATURAL GAS COMPANY, LLC,
EP ENERGY E& P COMPANY1 LP,
AND BRAMMER ENGINEERING, INC.
Judgment Rendered: DEC 112024
On Appeal from the
16th Judicial District Court
Parish of St. Mary, State of Louisiana
Trial Court No. 130527
The Honorable Suzanne deMaby, Judge Presiding
James R. Swanson Attorneys for Plaintiff A
- ppellant,
H.S. Bartlett, III
James J. Bailey, 111, Individually and as
Lance C. McCardle Representative of the Successions
E. Blair Schilling of Willie Palfrey Foster and
New Orleans, Louisiana Fairfax Foster Bailey
Gladstone N. Jones, III
Bernard E. Boudreaux
Kevin E. Huddell
Michael P. Arata
John T. Arnold
Rosa E. Acheson
Alayne Gobielle
Harvey S. Bartlett, III
New Orleans, Louisiana
George Arceneaux, III Attorneys for Defendant -Appellee,
Jamie D. Rhymes BP America Production Company
Court C. VanTassell
John S. Troutman
Randee V. Iles
Lafayette, Louisiana
Kelly Brechtel Becker
Mark R. Deethardt
Erin Bambrick
Trinity A. Morale
New Orleans, Louisiana
Michael P. Cash
Houston, Texas
BEFORE: WELCH, THERIOT, WOLFE, MILLER, AND STROMBERG, JJ.
Opinion on Rehearing
N
STROMBERG, J., on rehearing.
In this oil and gas contamination lawsuit,' plaintiff, James J. Bailey, 111,
individually and as the representative ofthe Successions of Willie Palfrey Foster and
Fairfax Foster Bailey, appeals a summary judgment granted in favor of one of the
named defendants, BP America Production Company (BP America), and dismissing
all of Mr. Bailey' s claims against BP America with prejudice. BP America answered
the appeal, seeking a clarification of the trial court' s reasons for judgment. This
court initially affirmed the trial court' s judgment and denied the answer to the
appeal.
Louisiana Wetlands, LLC v. Energen Resources Corp., 2023- 0564 ( La.
App. I Cir. 4/ 19/ 24), 390 So. 3d 378, 380. On June 21, 2024, this court granted a
rehearing. For the following reasons, we reverse the judgment and remand to the
trial court for further proceedings, and we deny the answer to appeal as moot.
The original plaintiffs in this case were Louisiana Wetlands, LLC, and New
90, LLC. However, Louisiana Wetlands was later removed and James J. Bailey, III
Mr. Bailey) was added as a new party plaintiff, both individually and in his capacity
as the representative of his mother' s and grandmother' s successions.' All claims of
New 90, LLC were dismissed through summary judgment, leaving Mr. Bailey as the
sole plaintiff in his individual and representative capacity for the Bailey family. See
Louisiana Wetlands, LLC v. Energen Resources Corp., 2021- 0290 ( La. App. I
Cir. 10/ 4/ 21), 330 So. 3d 674, 680, writ denied, 2021- 01610 (La. 1/ 12/ 22), 330 So. 3d
614 ( Louisiana Wetlands 1). In prior appeals, we have provided a detailed factual
1 These types of cases are also known as " legacy" lawsuits because they often arise from oil and
gas operations conducted many decades ago, leaving an unwanted legacy in the form of actual or
alleged contamination. Louisiana Wetlands, LLC v. Energen Resources Corp., 2021- 0290 (La.
App. I Cir. 10/ 4/ 21), 330 So. 3d 674, 676 n. 1, writ denied, 2021- 01610 ( La. 1/ 12/ 22), 330 So. 3d
614 ( Louisiana Wetlands 1).
2 A petition and two amending petitions were filed in this suit, with the original petition filed by
Louisiana Wetlands, LLC, and New 90, LLC. The second amending petition removed Louisiana
Wetlands, LLC, as a party plaintiff and added Mr. Bailey as a plaintiff. Throughout the opinion,
we reference Mr. Bailey and sometimes the Bailey family to represent the plaintiff' s position.
3
and procedural history of the underlying oil and gas activities and contamination
issues on the Bailey family property. See Louisiana Wetlands 1, 330 So. 3d at 676-
678; see also Louisiana Wetlands, LLC v. Energen Resources Corp., 2022- 1169
La. App. I Cir. 11/ 30/ 23), 380 So.3d 38, 41- 42, writ denied, 2024- 00004 ( La.
2/ 27/ 24), 379 So. 3d 1265 ( Louisiana Wetlands 11). We repeat only the facts
pertinent to the appeal currently before us, which will hereafter be referred to as
Louisiana Wetlands 111.
For over 100 years, the Bailey family has owned a 300 -acre tract of land
known as the Shady Retreat Plantation, near the Town ofFranklin in St. Mary Parish.
The property has been passed down through the Bailey family for generations. It is
undisputed that oil and gas exploration and production activities were historically
conducted on various areas of the Bailey property, pursuant to a 1948 mineral lease
entered into between Mr. Bailey' s family as lessors and Pan- American Production
Company ( Pan- American) as lessee. Pursuant to partial assignments beginning in
1952, three production companies, BP America, Chevron U.S. A., Inc., and Southern
Natural Gas Company, L.L.C. ( SNG), were each a successor to Pan -American' s
lessee interest in the 1948 lease. By 1973, all wells that were drilled and operated
under the 1948 lease had been plugged and abandoned. In 1975, the Bailey family
entered into two more leases for hydrocarbon production on their property. Energen
Resources Corporation is the successor to the 1975 leases; however, all operations
pursuant to the 1975 leases were terminated in July 2000, when the last two operating
wells were plugged and abandoned.
This lawsuit was initially filed in December 2016 by the Bailey family,
through their limited liability companies, asserting tort and contract claims against
all of the oil and gas lessees who operated at various times throughout the property' s
0
history of oil and gas production.' The Bailey family sought damages arising from
the historical oil and gas exploration and production activities on their property,
alleging environmental damage to their property, and additionally seeking to have
their contaminated property cleaned and restored to its original condition.
Pertinent to this appeal, it is important to note that in August and September
of 2020, SNG and Chevron filed limited admissions of liability under La. R.S. 30:29
more commonly known as " Act 312,"' with the trial court, each admitting to being
a responsible party for some, but not all, of the environmental damage on the Bailey
property. Chevron and SNG did not, however, admit to liability for any of the
plaintiffs private claims. The trial court referred the matter to the Louisiana
Department of Natural Resources, Office of Conservation ( LDNR) for a
determination ofthe most feasible plan (MFP} for remediation ofthe Bailey property
to applicable regulatory standards.' After the MFP was adopted, LDNR submitted
the MFP to the trial court, which was accepted and adopted by the trial court in a
judgment dated July 15, 2022. SNG and Chevron submitted the funds necessary to
implement the MFP into the registry of the trial court, and this court affirmed the
trial court' s judgment adopting the MFP. The Louisiana Supreme Court denied writs
on February 27, 2024. Louisiana Wetlands 11, 379 So. 3d at 1265.
3 A petition and two amending petitions were filed in this suit, with the initial petition naming
Energen Resources Corp., Chevron U.S. A., Inc., SNG, and Brat-nmer Engineering as defendants.
The first amending petition was filed to amend a paragraph in the petition as to property
descriptions and add exhibits concerning the same. The second amending petition added BP
America as a defendant. Brammer Engineering, Inc. was later dismissed from the suit when the
court signed an order granting its and Mr. Bailey' s joint motion for dismissal with prejudice.
4 Louisiana Revised Statutes 30: 29, also referred to as Act 312, has a stated legislative purpose of
ensuring that damage to the environment is remediated to a standard that protects the public
interest. Because this case involves environmental damage arising from oil and gas activities, Act
312 applies.
5
By 2023 La. Acts No. 150, § 5, effective January 10, 2024, La. R.S. 30: 29 was amended and
reenacted to rename LDNR to " Louisiana Department of Energy and Natural Resources, Office of
Conservation." However, in this opinion, we will continue to use " LDNR" to refer to the
department.
5
Meanwhile, on August 23, 2021, the trial court signed ajudgment that, among
other rulings, granted BP America' s motion for partial summary judgment and
dismissed Mr. Bailey' s claims for punitive damages and for additional remediation
required by an express contractual provision under La. R.S. 30: 29( M)( 1)( b).' The
judgment also granted BP America' s motion for partial summary judgment as to Mr.
Bailey' s claims " sounding in tort and continuing tort," including negligence claims
under La. C. C. art. 2315, claims for punitive and exemplary damages under former
La. C. C. art. 2315. 3, trespass and nuisance claims, strict liability claims under former
and current La. C.C. art. 667, and premises liability claims under La. C. C. arts. 2317
and 2322.
On July 29, 2022, BP America filed the summary judgment motion that is the
subject of this appeal, seeking dismissal of Mr. Bailey' s sole remaining claim against
it for unreasonable and excessive operations based upon implied lease obligations
under the 1948 lease. On August 29, 2022, the trial court heard the matter and issued
reasons for judgment and signed ajudgment, granting the summary judgment motion
in favor of BP America.' On August 30, 2022, the trial court signed a " Final
Judgment" in favor of BP dismissing with prejudice all claims and causes of action
asserted by the Bailey family against BP America.' Now, Mr. Bailey appeals from
6 Pursuant to BP America' s partial summary judgment motion, the trial court also dismissed with
prejudice Mr. Bailey' s claims against it for the following: civil fruits under La. C. C. art. 486, unjust
enrichment, a breach of the mineral servitude under La. R.S. 31: 22, stigma or diminution of
property value, and premises liability under La. C. C. art. 2322.
7 The motion for summary judgment at issue in this appeal was filed and decided under La. C. C. P.
art. 966 before its amendment by 2023 La. Acts No. 317, § 1, and 2023 La. Acts No. 368, § 1,
which became effective on August 1, 2023.
8
Ordinarily, a subsequent judgment identical in substance to an earlier judgment is considered
superfluous, unnecessary, and invalid. Jeandron v. Cenac, 2022- 1158 ( La. App. I Cir. 4/ 14/ 23),
365 So. 3d 851, 855 n. 2.
Notably, however, the original August 29, 2022 judgment granted the
motion for summary judgment and dismissed the claims against British Petroleum for
unreasonable and excessive operations; however, it appeared to be a partial final judgment that
was not designated as a final judgment after an express determination that there was no just reason
for delay pursuant to La. C. C.P. art. 1915( B)( 1). As such, the trial court properly signed the
subsequent August 30, 2022 judgment wherein it referred to its prior August 29, 2022 judgment
to correct this deficiency in the language of the judgment. See La. C. C. P. art. 1951; Jeandron,
6
the trial court' s judgment dismissing BP America from his suit, and BP America
filed an answer to this appeal, urging this court to affirm the trial court' s judgment
for a different reason.
is UT019A
Appellate courts review summary judgments de novo, using the same criteria
that govern the trial court' s determination of whether summary judgment is
appropriate; i.e., whether there is any genuine issue of material fact, and whether the
movant is entitled to judgment as a matter of law. Louisiana Wetlands 1, 330 So. 3d
at 678; see also La. C.C. P. art. 966(A)(3). 9 On a motion for summary judgment, the
initial burden of proof rests with the mover, See La. C. C.P. art. 966( D)( 1); Bayview
Loan Servicing, LLC v. Holden, 2023- 1347 ( La. App. I Cir. 6/ 7/ 24), 391 So.3d
751, 756, writ denied, 2024- 01032 ( La. 11/ 14/ 24), _ So.3d . If, however, the
mover will not bear the burden of proof at trial on the matter that is before the court
on the motion, the mover' s burden on the motion does not require that all essential
elements of the adverse party' s claim, action, or defense be negated. Instead, after
meeting its initial burden of showing that there are no genuine issues of material
fact, the mover may point out to the court that there is an absence of factual support
for one or more elements essential to the adverse party' s claim, action, or defense.
Thereafter, summary judgment shall be granted unless the adverse party can produce
factual evidence sufficient to establish the existence of a genuine issue of material
365 So. 3d at 855 n. 2. While the November 10, 2022 order of appeal refers to the August 29, 2022
judgment, the Bailey family refers to both judgments in its appellant brief.
9 BP America submitted the following in support of its summary judgment motion: the petition
and amending petitions; the affidavit of Howard J. Held, a certified professional landman, with the
1948 mineral lease attached as an exhibit; the August 23, 2021 judgment granting BP America' s
prior motion for summary judgment; and pleadings and deposition excerpts related to the MFP.
Mr. Bailey opposed the motion with excerpts and exhibits from the corporate deposition of
Chevron; the affidavits and expert reports of two engineers; and the transcript of the April 9, 2014
legislative hearing on Senate Bill No, 667, which amended Act 312. See 2014 La. Acts No. 400,
1.
7
fact or that the mover is not entitled to judgment as a matter of law. See La. C.C. P.
art. 966( D)( 1); Bayview Loan Servicing, LLC, 391 So.3d at 756- 57.
Because it is the applicable substantive law that determines materiality,
whether a particular fact in dispute is material can be seen only in light of the
substantive law applicable to the case. Johnson v. Knight, 2023- 1267 ( La. App. I
Cir. 6/ 14/ 24), 391 So. 3d 1126, 1129. This oilfield remediation case is governed by
the substantive law found in Act 312, and the facts are not in dispute.
LAW AND ANALYSIS
BP America, in its motion for summary judgment at issue in this appeal,
argued that Mr. Bailey' s remedies in excess of the MFP remediation must be
premised under La. R.S. 30: 29( M)( 1)( c) for breach of the implied obligation under
the lease not to operate unreasonably or excessively. It then contended that any
claims against BP America for implied lease obligations should be dismissed
because it was undisputed that neither BP America nor its predecessor, Pan-
American, engaged in any physical operations of their own. BP America contended
that an award of damages would be duplicative of the cost of funding and
implementing the MFP, which would preclude any damages award under La. R.S.
30: 29( M)( 1)( c).
According to BP America, Mr. Bailey was being made whole by
receiving specific performance of any obligation owed to him for the evaluation or
remediation of environmental damages to the property through the MFP, thereby
extinguishing his claims against it for the breach of implied lease obligations. BP
America also relied on State v. Louisiana Land & Exploration Co., 2020- 00685
La. 6/ 30/ 21), 347 So. 3d 684, 693 ( LL& E 11), to support its contention that Mr.
Bailey could not recover remediation damages exceeding the costs ofthe MFP where
there was no express contractual provision providing for such recovery.
However, the trial court did not address these issues in its reasons for its ruling
on the summary judgment motion. Instead, in its reasons for judgment, the trial
8
court stated that it had previously found that BP America was dismissed from any
additional tort claims. The trial court then stated that the claim raised in BP
America' s summary judgment motion concerned damage caused by unreasonable or
excessive operations, which it also classified as a tort claim. The trial court
concluded, "
That claim would not be available to [ Mr. Bailey] due to prior rulings
made by this Court.""
On appeal, Mr. Bailey assigns error to the trial court' s holding that his claims
for breach of implied obligations contained in the 1948 lease are tort claims.
However,, this issue was not raised by BP America in its motion for summary
judgment, and therefore, in its ruling, the trial court legally erred in granting the
summary judgment on this issue. Louisiana Code of Civil Procedure article
966( F)(
1) mandates that " summary judgment may be rendered or affirmed only as
to those issues set forth in the motion under consideration by the court at that time."
Furthermore, it is legal error for the trial court to grant summary judgment on the
basis of an issue not raised by the parties. See Rhodes v. AMKO Fence & Steel
Co., LLC, 2021- 0019 ( La. App. 5 Cir. 10/ 28/ 21), 329 So. 3d 1112, 1123; Cutrone
v. English Turn Property Owners Association, Inc., 2019- 0896 ( La. App. 4 Cir.
3/ 4/ 20), 293 So.3d 1209, 1218. Nonetheless, despite the trial court' s legal error in
this regard, the standard of review on summary judgment requires this court to
conduct a de novo review of BP America' s motion for summary judgment and to
determine whether there is any genuine issue of material fact and whether BP
America was entitled to judgment as a matter of law dismissing Mr. Bailey' s claims
against it for breach of the implied lease obligation under the 1948 lease to not
operate excessively and unreasonably. See Libertas Tax Fund 1, LLC v. Laiche,
10 The trial court had previously dismissed all of Mr. Bailey' s tort claims against BP America in
an August 13, 2021 judgment.
6
2021- 0330 ( La. App. I Cir. 12/ 22/ 21), 340 So.3d 236, 242- 243 n.6, writ denied,
2022- 00160 ( La. 4/ 12/ 22), 336 So. 3d 82.
BP America' s motion for summary judgment is based on a provision in La.
R.S. 30: 29 as enacted by Act 312. Act 312 was passed by the Louisiana Legislature
in 2006 to protect the public interest in litigation by requiring court -supervised,
defendant -funded cleanup for all environmental damage claims resulting from
oilfield operations. See 2006 La. Acts No. 312. In 2014, Act 312 was amended and
La. R.S. 30: 29, as amended," provides, in pertinent part:
H. (
1) This Section shall not preclude an owner of land from pursuing
a judicial remedy or receiving a judicial award for private claims
suffered as a result of environmental damage, except as otherwise
provided in this Section. Any award granted in connection with the
judgment for additional remediation in excess of the requirements of
the feasible plan adopted by the court is not required to be paid into the
registry of the court.
2) Damages that may be awarded in an action under this Section shall
be governed by the provisions of Subsection M of this Section. This
Section shall not be interpreted to create any cause of action or to
impose additional implied obligations under the mineral code or arising
out of a mineral lease.
MAM
M. ( 1)
In an action governed by the provisions of this Section, damages
may be awarded only for the following:
a) The cost of funding the feasible plan adopted by the court.
b) The cost of additional remediation only if required by an express
contractual provision providing for remediation to original condition or
to some other specific remediation standard.
c) The cost of evaluating, correcting or repairing environmental
damage upon a showing that such damage was caused by unreasonable
or excessive operations based on rules, regulations, lease terms and
implied lease obligations arising by operation of law, or standards
applicable at the time of the activity complained of, provided that such
damage is not duplicative of damages awarded under Subparagraph ( a)
or (b) of this Paragraph.
As originally enacted, La. R.S. 30: 29 did not include section (M) on damages. In 2014, La. R. S.
30: 29 was amended by 2014 La. Acts No. 400 to amend section (H) and add section (M).
10
d) The cost of nonremediation damages.
Legislation is the solemn expression of the will of the legislature. La. C. C.
art. 2; First National Bank, USA v. DDS Construction, LLC, 2011- 1418 ( La.
1/ 24/ 12), 91 So. 3d 944, 953. The determination of the legislature' s will must start
with the language of the statute itself. First National Bank, 91 So. 3d at 953. The
words used must be interpreted as they are generally understood. La. C. C. art. 11;
First National Bank, 91 So. 3d at 953. The rules of statutory construction provide
that when the words of a statute are clear and unambiguous, and the application of
the law does not lead to absurd consequences, the statute should be applied as written
and no further effort should be made to determine the legislature' s intent. See La.
C. C. art. 9; see also La. R.S. 1: 4. When the language is susceptible of different
meanings, it must be interpreted as having the meaning that best conforms to the
purpose of the law. M.J. Farms, Ltd. v. Exxon Mobil Corp., 2007- 2371 ( La.
7/ 1/ 08), 998 So. 2d 16, 27.
This statute is clear and unambiguous— La. R.S. 30:29( H) provides that
d] amages that may be awarded in an action under this Section shall be governed
by the provisions of Subsection M," which lists them as: the regulatory level MFP
La. R.S. 30: 29( M)( 1)( a)), additional remediation pursuant to an express contractual
provision ( La. R.S. 30: 29( M)( 1)( b)), the cost of repairing environmental damage
caused by unreasonable or excessive operations based on " implied lease
obligations" where not duplicative with the first two categories ( La. R.S.
30: 29( M)( 1)( c)), and non -remediation damages ( La. R.S. 30: 29( M)( 1)( d)).
In its motion for summary judgment, BP America relies on the Louisiana
Supreme Court' s opinions in State v. Louisiana Land & Exploration Co., 2012-
0884 ( La. 1/ 30/ 13), 110 So. 3d 1038 ( LL& E 1), and LL& E 11, 347 So. 3d at 693, to
support its contention that pursuant to La. R.S. 30: 29, Mr. Bailey cannot recover
remediation damages exceeding the costs of the MFP unless there is an express
11
contractual provision providing for such. In LL& E 1, which involved prescription
issues and awards of damages for the remediation of contaminated property, the
supreme court considered La. R.S. 30: 29 before its amendment in 2014 and held that
the landowner could recover damages in excess of those needed to remediate the
property to state regulatory standards, even in the absence of a contractual provision;
moreover, it held that the damages did not need to be deposited into the court
registry. LL& E 1, 110 So. 3d at 1054. 12 However, in LL& E 11, a later appeal in the
same case, the supreme court overturned its ruling in LL& E 1, stating that it
incorrectly held that excess remediation damages were allowed under Act 312" and
concluded that a landowner' s recovery is limited to a regulatory cleanup of
contaminated property, unless the patties had expressly contracted for remediation
in excess of Act 312' s requirements. LL& E 11, 347 So. 3d at 691, 693. BP America
relies on the supreme court' s statements, " We need look no further than the plain
language of Act 312 itself to recognize this Court' s prior error. We also note the
Legislature cured this Court' s error by amendment in 2014 to La. R.S. 30: 29(M)
2014)." ( footnote omitted). LL& E 11, 347 So.3d at 691. However, BP America' s
reliance on LL& E I and LL& E 11 is misplaced. In those cases, the supreme court
did not interpret the version of La. R.S. 30:29 that is applicable in this case, which
is the statute as amended in 2014. See State v. Louisiana Land & Exploration
Co., 2020- 00685 ( La. 6( l/ 22), 339 So. 3d 1163, 1164 n. 1 ( LL& E 111). 11
In conducting a de novo review of BP America' s motion for summary
judgment, we initially note that Mr. Bailey' s claim for damages against BP America
for breach of implied obligations under La. R.S. 30: 29( M)( 1)( c) is not duplicative of
12 In LL&E 1, 110 So. 3d at 1054, the court also noted that La. R.S. 30:29 " does nothing to the
substantive rights of the landowner, whether arising out of ( 1) the implied obligations of the
mineral lease under the Civil Code or (2) the implied obligation arising out of La. R.S. 31: 122 if
the landowner can show a mineral lessee has acted unreasonably or excessively under the lease."
In LL& E III, the supreme court granted rehearing of LL& E 11 and affirmed its ruling in LL& E
11. LL& E 111, 339 So. 3d at 1166.
12
or based on a claim for damages under La. R.S. 30: 29( M)( 1)( a) or ( b). Mr. Bailey' s
claim for damages is not based on the costs of funding the MFP under La. R.S.
30: 29( M)( 1)( a). As to his claim for additional remediation pursuant to an express
contractual provision pursuant to La. R.S. 30: 29( M)( 1)( b), the trial court deten-nined
in its August 23, 2021 judgment that the 1948 lease did not contain an express
provision providing for remediation to original condition or to some other specific
remediation standard.
In addition, BP America contended that it should not be liable on a contract
claim for unreasonable or excessive operations because Pan- American did not
engage in the operations under the 1948 lease; rather, the operations were only
conducted by Pan -American' s assignees, who admitted liability for some of the
damages. 14 However, La. R.S. 30: 29( M)( 1)( c) does not require that the damages
sought under an implied obligations claim be caused by the operations physically
performed by the party found responsible. Rather, La. R.S. 30:29( M)( 1)( c) provides
that damages may be awarded for "[ t]he cost of evaluating, correcting or repairing
environmental
damage upon a showing that such damage was caused by
unreasonable or excessive operations This statute does not require that those
unreasonable or excessive operations be performed by a particular party in order for
the damages to be awarded. Indeed, La. R.S. 30: 29( 0)( 1) contemplates any route to
legal responsibility for those damages: " If at any time during the proceeding a party
admits liability for environmental damage or the finder of fact determines that
environmental damages exists and determines the party or parties who caused the
damage or who are otherwise legally responsible therefor...." ( Emphasis added).
Thus, this statute does not abrogate the standards of legal responsibility applicable
to original lessees in the case of a subsequent assignment. In addition, we note that
It is also undisputed that BP America did not actually drill or operate any of the wells that were
authorized under the 1948 lease, which is the only lease that could affect Mr. Bailey' s recovery
against BP America as one of the successors in interest to the original lessee, Pan- American.
13
there is no written release by the Bailey family that would discharge Pan -American' s
and therefore BP America' s) obligations as the original lessee under those
assignments. See La. R.S. 31: 129 (" An assignor or sublessor is not relieved of his
obligations or liabilities under a mineral lease unless the lessor has discharged him
expressly and in writing.").
We now consider whether the facts that SNG and Chevron admitted limited
liability under La. R.S. 30: 29(M)( 1)( c) ( and La. C. C.P. art. 1563) and were referred
to the LDNR to create an MFP, which was later adopted by the trial court, and that
BP America never actually drilled or operated any wells on the Bailey property
would preclude the claim under La. R.S. 30: 29( M)( 1)( c). We note that Chevron and
SNG admitted to liability for some— but not all ---of the environmental damage, and
they did not admit to liability for any of Mr. Bailey' s private damage claims. While
a party or parties may admit to liability for all or some of the damages claimed by a
plaintiff, it logically follows that only those parties/claims are subject to the MFP,
and that a non-party to an MFP cannot take advantage of that MFP, and further, that
a plaintiff can still pursue private claims, or even those not covered by the MFP, to
demonstrate that defendants are liable for damages not admitted to by a party. See
Hero Lands Company, LLC v. Chevron USA, Inc., 2022- 0383 ( La. App. 4 Cir.
5/ 22/ 23), 382 So.3d 271, 285, writ granted in part on other grounds and remanded,
2023- 01050 ( La. 10/ 10/ 23), 370 So. 3d 1062; State v. Louisiana Land &
Exploration Co., 10- 1341 ( La. App. 3 Cir. 2/ 1/ 12), 85 So. 3d 158, 162, affirmed,
2012- 0884 ( La. 1/ 30/ 13), 110 So. 3d 1038 ( LL& E 1).
Based on a de novo review of BP America' s motion for summary judgment,
BP America failed to establish that it was entitled to judgment as a matter of law
dismissing Mr. Bailey' s claims against it for breach of the implied lease obligation
under the 1948 lease to not operate unreasonably or excessively. Therefore, we find
that the trial court erred in granting summary judgment in favor of BP America and
14
dismissing Mr. Bailey' s claims for breach of implied obligations against BP
America.
ANSWER TO APPEAL
BP America filed an answer to Mr. Bailey' s appeal, requesting that this court
affirm the August 29, 2022 judgment of the trial court on the basis that Mr. Bailey' s
claims for excess remediation are barred under Act 312 as interpreted by the
Louisiana Supreme Court in LL& E 11. Considering our discussion interpreting and
applying the 2014 amendment of Act 312, we find that the relief sought in BP
America' s answer to this appeal should be denied as moot. See Cook v. Rigby,
2019- 1475 ( La.,App. I Cir. 11/ 25/ 20), 316 So. 3d 482, 488, writ denied, 2020- 01493
La. 3/ 9/ 21), 312 So. 3d 588.
CONCLUSION
For the assigned reasons, we deny BP America Production Company' s answer
to this appeal as moot. We hereby reverse the trial court' s August 29, 2022 and
August 30, 2022 judgments granting summary judgment in favor of BP America
Production Company and dismissing all claims of James J. Bailey, 111, individually
and as the representative of his mother' s and grandmother' s successions, against BP
America Production Company. All costs of this appeal are assessed to BP America
Production Company.
w7ftwilMW
MrST011
15
STATE OF LOUISIANA
FIRST CIRCUIT
2023 CA 0564
LOUISIANA WETLANDS, LLC, AND NEW 90, LLC
V51MV0
ENERGEN RESOURCES CORPORATION, ET AL
WOLFE, J., DISSENTS AND ASSIGNS REASONS.
I respectfully dissent for the reasons initially expressed in our original
opinion, Louisiana Wetlands v. Energen Resources Corp., 2023- 0564 ( La. App.
Ist Cir. 4/ 19/ 24), 390 So3d 378. Additionally, I emphasize that the scope of a
mineral lessee' s obligations, pursuant to the Civil Code and Mineral Code ( to return
the leased property in a condition that is the same as when it was delivered), has
been modified by subsequent legislation found in La. R.S. 30: 29, also known as Act
312. Sections ( H) and ( M) of La. R.S. 30: 29 reflect that, absent an express
contractual provision, damages may only be awarded up to the amount necessary to
remediate the property to state regulatory standards. Since it is undisputed that BP
America never operated on the property, there is a lack of evidence proving the
essential element of causation in Mr. Bailey' s claim for damages caused by
unreasonable or excessive operations" based upon implied lease obligations. Thus,
I disagree with the majority' s interpretation of Act 312 as it applies to the facts of
this case, and I would affirm the trial court' s grant of summary judgment in favor of
BP America and the dismissal of Mr. Bailey' s claims against BP America.
1
COURT OF APPEAL, FIRST CIRCUIT
STATE OF LOUISIANA
RE: Docket Number 2023-CA-0564
James J. Bailey, III and New 90 LLC
Versus - -
16th Judicial District Court
Energen Resources Corporation, Successor in Interest to case #: 130527
Minatome Corporation and Total Minatome Corporation, St. Mary Parish
Chervron U.S. A., Inc., Successor in Interest to Chevron
Oil Company and California company, Southern Natural
Gas Company, LLC, successor in Inter
On Application for Rehearing filed on05/03/2024byJames J. Bailey, III and New 90 LLC
Rehearing ~ --{ 1") ( Qt\, +- ed
cgz
Jewel E."Duke" Welch Jr.
Elizabeth Wolfe
Katherine Tess Stromberg
Date JUN 2 1 2024 ---
w--Q..---c.g-~.,;;;__.;_s __ ~-L,,Li-.... ----
Rodd Naquin, Clerk