55,913-CA Precedential Reversed; Remanded. Processed

ETC Tiger Pipeline LLC v. Louisiana Energy Gateway LLC

Louisiana Court of Appeal, Second Circuit · Filed October 2, 2024

Authorities cited

Identified automatically; this list may not be exhaustive.

Opinion text

Judgment rendered October 2, 2024.
Application for rehearing may be filed
within the delay allowed by Art. 2166,
La. C.C.P.

No. 55,913-CA

COURT OF APPEAL
SECOND CIRCUIT
STATE OF LOUISIANA

*****

ETC TIGER PIPELINE, LLC Plaintiff-Appellee

versus

LOUISIANA ENERGY Defendant-Appellant
GATEWAY LLC

*****

Appealed from the
Forty-Second Judicial District Court for the
Parish of DeSoto, Louisiana
Trial Court No. 84,242

Honorable Amy Burford McCartney, Judge

*****

PHELPS DUNBAR, LLP Counsel for
By: H. Alston Johnson, III Defendant-Appellant
Brad M. Boudreaux
Kevin W. Welsh
Stephen R. Vick, Jr.
Anthony J. Gambino, Jr.
Jordan P. Zeringue
Nena M. Eddy

ETHAN P. ARBUCKLE Counsel for
Defendant-Appellant

BRADLEY MURCHISON Counsel for
KELLY & SHEA, LLC Plaintiff-Appellee
By: Kay Cowden Medlin
Leland Gray Horton
Ashley Gill Gable

GORDON, ARATA, Counsel for Appellee,
MONTGOMERY, American Petroleum
BARNETT, MCCOLLAM, Institute
DUPLANTIS & EAGAN, LLC
By: Scott A. O’Connor

GORDON, ARATA, Counsel for Appellee,
MONTGOMERY, Interstate Natural Gas
BARNETT, MCCOLLAM, Association of America
DUPLANTIS & EAGAN, LLC
By: Clinton Peck Hayne, Jr.

CARVER, DARDEN, Counsel for Appellee,
KORETZKY, TESSIER, Louisiana Landowners
FINN, BLOSSMAN & Association
AREAUX, LLC
By: Brandon T. Darden

WARREN BENJAMIN BATES, JR. Counsel for Appellee,
Assistant Attorney General State of Louisiana

*****

Before COX, HUNTER, and MARCOTTE, JJ.

HUNTER, J.

Defendant, Louisiana Energy Gateway LLC, appeals a trial court

judgment in favor of plaintiff, ETC Tiger Pipeline LLC, which granted a

preliminary injunction to prevent Louisiana Energy Gateway, LLC from

constructing a pipeline based on an ETC Tiger Pipeline, LLC servitude. For

the following reasons, we reverse and remand.

FACTS

ETC Tiger Pipeline, LLC (“ETC”) is a subsidiary of Energy Transfer

LP (“Energy Transfer”), and an affiliate of a company called Enable

Midstream Partners, LP. Louisiana Energy Gateway, LLC (“LEG”) is a

subsidiary of The Williams Companies, Inc. (“Williams”).

In 2009, ETC Tiger obtained a Permanent Easement Agreement from

NORWELA Counsel, Boy Scouts of America (“NORWELA”) granting unto

ETC “an exclusive sixty foot (60’) wide free and unobstructed permanent

easement in order to construct, operate and maintain one (1) pipeline of any

diameter and any appurtenant facilities (all of which shall be and remain the

property of Grantee) in, over, through, across, under and along [the

NORWELA Property].” ETC has the right to use the ETC/NORWELA

servitude “for the purposes of establishing, laying, constructing,

reconstructing, installing, realigning, modifying, replacing, improving,

adding, altering, substituting, operating, maintaining, accessing, inspecting,

patrolling, protecting, repairing, changing the size of, relocating and

changing the route or routes of, abandoning in place and removing at will, in

whole or in part, a pipeline, for the transportation of natural gas and all by-

products thereof or any liquids, gases or substances which can be transported

through a pipeline, together with above and below ground appurtenances as

may be necessary or desirable for the operation of the pipeline, over, across,

under and upon” the NORWELA Property. The ETC/NORWELA servitude

includes additional language relevant to the instant litigation, as follows:

Although Grantor hereby grants an exclusive permanent
easement to the Permanent Easement Property, Grantee agrees
to subrogate on a case-by-case basis its exclusive rights
hereunder to subsequent grants to others of similar rights for
construction, operation and maintenance of the pipeline
provided that the exercise of such subsequent rights must
accommodate the rights herein granted to Grantee. The rights
that must be accommodated include, but are not limited to, (a)
Grantee’s selection of location of the pipeline within Permanent
Easement Property; (b) Grantee’s occupancy or planned
occupancy of any portion of the Permanent Easement Property;
and (c) compliance with Grantee’s “work in proximity” rules
for encroaching or crossing pipelines and/or facilities.

Specifically, ETC negotiated inclusion of the term “exclusive” and

paid a premium for “exclusive” use of servitudes. Furthermore, the language

above was prepared by ETC for inclusion in the ETC/NORWELA servitude,

as well as other unrelated servitudes sought by ETC. ETC alleges they have

not consented to LEG’s request to bore or cross its pipeline underneath the

ETC pipeline on the NORWELA property.

In March of 2023, NORWELA granted a Pipeline Servitude and Right

of Way agreement in favor of LEG crossing the NORWELA property. The

LEG/NORWELA servitude primarily traverses adjacent to and north of the

ETC/NORWELA servitude until it reaches the eastern NORWELA Property

line where it crosses beneath the ETC pipeline. This is the proposed pipeline

crossing which prompted this litigation. The LEG/NORWELA servitude

contains the following provision in pertinent part:

Existing Encumbrances. The rights of [LEG] acquired in this
Agreement are subject to any existing prior recorded leases,
servitudes or other encumbrances of record, including, but not
limited to the following: (i) any prior recorded encumbrances,
leases, mortgages, easements, servitudes, right-of-way,
2

restrictions, including, but not limited to, subdivision
restrictions, subdivision plats, building restrictions, and
restrictive covenants, and other prior recorded burdens affecting
the Grantor’s Land and [LEG] is solely responsible for
determining and obtaining any consents required from third
parties[.]

On May 23, 2023, Ms. Wendy Whitfill-Embry, on behalf of LEG,

emailed Mr. Mark Vedral, on behalf of ETC, stating LEG’s plans to cross

ETC’s pipeline system in 42 locations.1 Ms. Whitfill-Embry advised if ETC

expressed no objection by June 6, 2023, their silence would be assumed as

no objections. On May 31, 2023, Mr. Vedral emailed Ms. Whitfill-Embry

requesting information regarding the proposed crossings and informing her

until receipt of the requested information ETC objects to LEG’s crossing

requests.

On June 30, 2023, LEG filed a petition for declaratory judgment

(“Declaratory Judgment”) naming ETC as a defendant, involving the

NORWELA Property and the pipeline servitudes involved herein. The

petition for declaratory judgment states construction of LEG’s pipeline is

expected to begin by the end of 2023 or early 2024. Subsequently, Mr.

Malstrom, on behalf of LEG, informed Mr. Vedral, LEG intended to

commence construction of the LEG pipeline despite ETC’s objections. LEG

chose to accelerate construction on the NORWELA Property, despite the

fact LEG has not hired a contractor for construction of the pipeline. Notably,

no construction has begun on the LEG pipeline at any location, including the

NORWELA Property. ETC sought a preliminary injunction to protect a real

right in immovable property.

1
The record provides different number of times which LEG pipeline will cross
ETC pipeline (42 and 43 times). This opinion will state the crossing will occur 42 times.
3

The district court granted ETC’s requested restraining order in July

2023 without a formal hearing and it set ETC’s requested preliminary

injunction on August 15, 2023, where it heard testimony from two ETC

witnesses and three LEG witnesses. The district court found ETC’s servitude

allowed the construction, operation, and maintenance of one pipeline of any

diameter; the servitude allowed ETC to replace, improve, add, alter, change

the size of, relocate, and change the route of the pipeline; and the servitude

contained no depth limitation. The district court also held proving

irreparable harm is not necessary for an injunction of this nature. However,

ETC has proven irreparable harm would occur if LEG’s pipeline were built

because it will stay there forever.2

The trial court found both ETC/NORWELA and LEG/NORWELA

servitudes are clear and explicit. A plain reading of the respective servitudes

does not lead to absurd consequences. Accordingly, the court need not go

beyond the four corners of each document. Reading the ETC/NORWELA

servitude as a whole and utilizing the ordinary meaning of the word

“exclusive,” ETC agrees to subrogate its exclusive rights, on a case-by-case

basis.

The district court granted ETC’s requested preliminary injunction

based on written reasons with a formal order on December 18, 2023.

LEG appealed.3

2
The proposed pipeline would encroach upon the ETC Tiger/NORWELA
servitude and bore beneath the 42” ETC Tiger pipeline to install LEG’s 36” pipeline.

The following parties have filed amicus briefs in support of LEG and allowing
3

the pipeline crossing: American Petroleum Institute, Interstate Natural Gas Association of
America, Louisiana Landowner’s Association, Inc., and The State of Louisiana- Office of
the Attorney General.

4

STANDARD OF REVIEW

A trial court has broad discretion in ruling on a preliminary injunction

and its ruling will not be disturbed absent an abuse of discretion. Powertrain

of Shreveport, L.L.C. v. Stephenson, 49,327 (La. App. 2 Cir. 10/1/14), 149

So. 3d 1274.

According to La. C.C.P. art. 3601, an injunction shall be issued in

cases where irreparable injury, loss, or damage may otherwise result to the

applicant, or in other cases specifically provided by law. In order to obtain a

preliminary injunction a plaintiff must show he will suffer irreparable harm

if the injunction is not granted, that he is entitled to the relief sought, and he

must make a prima facie case showing that he will prevail on the merits.

Louisiana Granite Yard, Inc. v. LA Granite Countertops, L.L.C., 45,482 (La.

App. 2 Cir. 8/18/10), 47 So. 3d 573, writ denied, 10-2354 (La. 12/10/10), 51

So. 3d 733.

DISCUSSION

ETC addressed the rules NORWELA, as grantor, and ETC, as

grantee, will follow relating to the servitude granted on NORWELA’s

property. Paragraph 7 of the ETC Tiger servitude provides with emphasizes

added:

Grantor may not use any part of the Permanent Easement
Property if such use may damage, destroy, injure, and/or
interfere with the Grantee’s use of the Permanent Easement
Property for the purposes for which the permanent easement is
being sought by Grantee. Grantor is not permitted to conduct
any of the following activities on the Permanent Easement
Property without the written permission of Grantee: (1)
construct any temporary or permanent building on the site
improvements, other than streets and roads; (2) drill or operate
any well; (3) remove soil or change the grade or slope; (4)
impound surface water; or (5) plant trees or landscaping.
5

Grantor further agrees that no above or below ground
obstruction that may interfere with the purposes for which
this easement is being acquired may be placed, erected,
installed, or permitted upon the Permanent Easement
Property without the written permission of Grantee.

According to La. C.C. art. 645, a right of use is governed by usufruct

and predial servitudes to the extent their application is compatible. A predial

servitude is a charge on a servient estate for the benefit of a dominant

estate.4 In this case, NORWELA is the only estate, and ETC and LEG have

servitudes granted to them for the purpose of constructing pipelines. Since

this case involves a right of use granted by NORWELA to ETC and LEG,

not two estates, the article pertaining to predial servitude does not apply.

Furthermore, the language of the servitude granted by NORWELA to ETC

provides an exclusive right to lay one pipeline. The interpretation of the

language refers to the one pipeline, not all future pipelines.5

Additionally, ETC’s “exclusive” servitude on the NORWELA

Property does not allow it to prevent subsequent crossings, including LEG’s

crossing. In ETC Tiger Pipeline, LLC v. DT Midstream, Inc., 55,534 (La.

App. 2 Cir. 4/10/24), 384 So. 3d 458, this Court held a one-time use of the

word “exclusive” in a pipeline servitude does not transfer the landowner’s

right to grant efficacious pipeline servitudes to the “exclusive” servitude

holder. This Court explained the civil code contemplates the creation of

multiple servitudes on a servient estate. Also, this Court explained

“exclusive” pipeline servitudes do not extend to the center of the earth

4
La. C.C. art. 646.
5
La. C.C. art. 720 provides: Doubt as to the existence, extent, or manner of
exercise of a predial servitude shall be resolved in favor of the servient estate.
6

without express language stating as such. This means servitude holders, such

as LEG, may cross beneath an existing “exclusive” servitude without

violating the real rights of the original servitude holder.

Furthermore, ETC’s argument stating LEG’s subsequent crossing

interferes with its enjoyment of its servitude lacks merit. According to ETC,

LEG demanding 42 crossings to be reviewed and approved at one time

within nine days violated the established custom of reciprocal crossing.

However, NORWELA did not provide ETC, as a servitude holder, the right

to approve or deny subsequent servitudes which do not interfere with its one

pipeline. There was no showing the installation of the pipelines would

adversely affect or cause disturbance to ETC’s right to enjoy the property

beyond just its existence or presence therein. As mentioned above, ETC

agreed to subrogate its rights on a case-by-case basis to subsequent grantees

for similar rights. Thus, ETC is without authority to deny or approve LEG’s

pipeline request without showing irreparable harm to its existing servitude.

Consequently, the record does not reveal how LEG’s below ground

obstruction of a pipeline will interfere with ETC’s servitude rights to

operate, maintain, repair, or replace ETC’s existing active pipeline. If any

adjustments or changes needed to be made, or if there was a safety concern

as posed by ETC, then those requests should have been made, rather than

blanket denials, which serve as a mechanism to deny others their ability to

exercise their real right in immovable property. Furthermore, ETC did not

mention it lacked clarity regarding LEG’s plans and any surface

encroachment. After reviewing this record, we find the district court erred in

its interpretation of the ETC/NORWELA servitude. We further find ETC

has failed to show irreparable harm to prevail on the merits.
7

CONCLUSION

For the reasons set forth herein, the judgment of the district court

granting the preliminary injunction is hereby reversed, and this matter is

remanded for further proceedings. Costs of the appeal are assessed to

plaintiff, ETC Tiger Pipeline, LLC.

REVERSED; REMANDED.

8