Judgment rendered February 26, 2025.
Application for rehearing may be filed
within the delay allowed by Art. 2166,
La. C.C.P.

No. 56,073-CA

COURT OF APPEAL
SECOND CIRCUIT
STATE OF LOUISIANA

*****

ETC TIGER PIPELINE, LLC Plaintiff-Appellee

versus

LOUISIANA ENERGY Defendant-Appellant
GATEWAY, LLC

*****

Appealed from the
First Judicial District Court for the
Parish of Caddo, Louisiana
Trial Court No. 645,193

Honorable Michael A. Pitman, Judge

*****

PHELPS DUNBAR, LLP Counsel for Appellant
By: H. Alston Johnson, III
Brad M. Boudreaux
Kevin W. Welsh
Anthony J. Gambino, Jr.
Nena M. Eddy

NICKELSON LAW FIRM
By: John C. Nickelson

BRADLEY MURCHISON Counsel for Appellee,
KELLY & SHEA, LLC ETC Tiger Pipeline, LLC
By: Kay C. Medlin
Leland G. Horton
Joshua S. Chevallier
Ashley G. Gable

GORDON, ARATA, MONTGOMERY, Counsel for Amicus
BARNETT, McCOLLAM, DUPLANTIS Curiae, American
& EAGAN, LLC Petroleum Institute
By: Scott A. O’Connor

GORDON, ARATA, MONTGOMERY, Counsel for Amicus
BARNETT, McCOLLAM, DUPLANTIS Curiae, Interstate
& EAGAN, LLC Natural Gas Association
By: C. Peck Hayne, Jr. of America
J. Douglas Rhorer

CARVER, DARDEN, KORETZKY, Counsel for Amicus
TESSIER, FINN, BLOSSMAN Curiae, Louisiana
& AREAUX, LLC Landowners
By: M. Taylor Darden Association, Inc.
Brandon T. Darden

*****

Before STEPHENS, MARCOTTE, and ELLENDER, JJ.

ELLENDER, J.

Louisiana Energy Gateway LLC (hereinafter, “LEG”) appeals a

judgment that granted a preliminary injunction in favor of the plaintiff, ETC

Tiger Pipeline LLC (“ETC Tiger”), enjoining LEG from utilizing its

servitude by entering and building a natural gas pipeline on property subject

to a prior, “exclusive” servitude in favor of ETC Tiger. Following this

court’s reasoning in ETC Tiger Pipeline LLC v. DT Midstream Inc., 55,534

(La. App. 2 Cir. 4/10/24), 384 So. 3d 458, writ denied, 24-00763 (La.

10/8/24), 394 So. 3d 271 (hereinafter, “ETC Tiger”), we reverse and remand.

FACTUAL BACKGROUND

In September 2009, ETC Tiger obtained a permanent easement

agreement from LEMAC Farms for a 50-foot gas pipeline servitude running

basically east-west over an 80-acre tract in southern Caddo Parish. ETC

Tiger built and began using its pipeline soon after.

In January 2023, LEG obtained a pipeline servitude and right-of-way

agreement, also from LEMAC Farms, for a 50-foot gas pipeline servitude

running basically north-south over the same tract. To build this pipeline

would obviously require LEG to cross ETC Tiger’s existing pipeline.

According to the petition, on May 23, 2023, LEG’s parent company

contacted ETC Tiger for an assessment and consent to build 42 crossings

over ETC Tiger’s pipelines, including this one, and wanted an answer within

14 days. When ETC Tiger asked for further information, LEG allegedly

responded with “partial, inaccurate, and incomplete” information and further

asserted that it could simply “expropriate the proposed crossings.” After

some exchange of emails and phone calls, ETC Tiger denied LEG’s request;

in June 2023, LEG filed a suit for declaratory judgment, in the First JDC,

seeking clarification of its rights.1 Then, in July 2023, a contractor working

for LEG made a “Louisiana One Call”2 stating its intent to cross ETC

Tiger’s pipeline no later than August 10.

ETC Tiger filed the current suit, in the First JDC, on July 24, 2023,

seeking a temporary restraining order, preliminary injunction, and

permanent injunction. It alleged the facts outlined above. The district court

granted the TRO, with ETC Tiger posting a $100,000 bond. The case came

up for a hearing on August 17, 2023. Witnesses for ETC Tiger included

Mark Vedral, senior director of land and right-of-way in ETC Tiger’s

engineering and construction group; Judd Tinkle, encroachment project

manager for Energy Transfer LP (ETC Tiger’s parent company); and

Stephen Futch, vice-president of interstate engineering for Energy Transfer.

Testifying for LEG were three employees of The Williams Company

(LEG’s parent company): Eric Malstrom, project director over LEG

programs; Wendy Whitfill-Embry, a land manager; and Curtis Lee West,

manager of construction. The parties also offered 38 exhibits.

The district court filed a five-page written opinion on October 10,

2023, granting the preliminary injunction. The court outlined the

background facts, the pleadings, and the basic law of injunction, and noted

that LEG’s 14-day timeline was “unrealistic” and “lacking good faith.”

Chiefly, the court focused on ETC Tiger’s permanent easement agreement,

1
Apparently, this suit is still pending.
2
Louisiana One Call, also known as “Louisiana 811,” is a quasi-governmental
clearinghouse for all excavations statewide.
2

particularly Paragraph 4, which referred to an “exclusive” servitude, and

found this conferred the right to exclude all other use of the servitude.3 The

court also rejected LEG’s contention that Paragraph 4’s references to third-

party use required ETC Tiger to accommodate LEG’s crossing request.

The court rendered judgment granting the preliminary injunction on

October 24, 2023. LEG appealed devolutively.

DISCUSSION

LEG raises two assignments of error. By its first assignment, it urges

the court erred as a matter of law when it concluded that ETC Tiger’s

“exclusive” servitude allowed it to forbid LEG from constructing a pipeline

within LEG’s servitude and across the property burdened by ETC Tiger’s

servitude. This assignment has merit.

In ETC Tiger, this court addressed the same argument: whether

Paragraph 4’s one-time use of the phrase “exclusive permanent easement”

entitled ETC Tiger to block crossings that meet all other industry standards

for safety. This court rejected that argument, finding instead that Paragraph

4 did not confer a right that extended to the center of the earth.4 As a result,

this court dissolved an injunction that read Paragraph 4 as an “exclusive

servitude.” In subsequent cases, this court has reaffirmed this interpretation

3
Paragraph 4 is quoted in the prior opinions, but it is reprinted here:
“Although Grantor hereby grants an exclusive permanent easement to the
Permanent Easement Property, Grantee agrees to subrogate on a case-by-case basis its
exclusive rights hereunder to subsequent grants to others of similar rights for
construction, operation and maintenance of pipelines provided that the exercise of such
subsequent rights must accommodate the rights herein granted to Grantee. The rights that
must be accommodated include, but are not limited to, (a) Grantee’s selection of location
of pipelines within the Permanent Easement Property; (b) Grantee’s occupancy or
planned occupancy of any portion of the Permanent Easement Property; and (c)
compliance with Grantee’s ‘work in proximity’ rules for encroaching or crossing
pipelines and/or facilities.”
4
This opinion was not rendered until April 10, 2024, six months after the district
court issued its reasons for judgment herein.
3

of Paragraph 4, dissolving similar injunctions. ETC Tiger Pipeline LLC v.

La. Energy Gateway LLC, 55,913 (La. App. 2 Cir. 10/2/24), 2024 WL

4365399, writ denied, 24-01350 (La. 1/14/25), 2025 WL 87595 (the

“NORWELA” case); Enable Midstream Partners LP v. La. Energy Gateway

LLC, 55,916 (La. App. 2 Cir. 10/2/24), 2024 WL 4366941 (the “Ricks”

case).

ETC Tiger contends that this case is “unlike ETC Tiger” in that it is

“not a pipeline crossing case” but, rather, a test of “LEG’s efforts to

challenge [Energy Transfer’s] servitude rights at 43 separate locations.” It

argues the injunction is proper because LEG is trying to install a 176-mile

high-pressure pipeline “hurriedly and without the usual scrutiny[.]” On

close examination, we do not see the alleged distinction. In essence, ETC

Tiger is simply relitigating ETC Tiger, such as by suggesting it improperly

relied on witnesses who testified as to practices in other states, with different

parties, and using different contracts with no counterpart of Paragraph 4.

Ultimately, however, ETC Tiger concludes that LEG’s argument, and ETC

Tiger’s holding, is “simply wrong.”

On the contrary, we see no reason to deviate from our earlier holding

in ETC Tiger, NORWELA, and Ricks. LEG’s argument has merit. The

wording of Paragraph 4 will not support the blanket injunction issued by the

district court.

By its second assignment of error, LEG submits the court’s legal error

in finding an “exclusive” servitude interdicted the factfinding process, thus

warranting a de novo review, under Said v. Federated Rural Elec. Ins. Exch.,

21-00078 (La. 4/20/21), 313 So. 3d 1241. Alternatively, it submits the

court’s finding that LEG imposed an unreasonable deadline is plainly wrong.
4

Citing trial exhibits, it shows that emails from ETC Pipeline’s parent

company, Energy Transfer, asked that all documents pertaining to LEG

crossings be sent at one time; LEG advised ETC Tiger that the LEMAC

Farms crossing should be prioritized; Energy Transfer’s own internal

guidelines call for any such review to take place within 30 days; and LEG

resubmitted all documents by June 5, 2023.

ETC Tiger responds that the district court found an “absence of

LEG’s complete dataset,” and argues this is sufficient to support the

injunction. It cites Futch’s testimony that LEG’s plans might leave a

“swimming pool * * * on either size of our easement” and “holes big enough

for cows to fall in.” Mostly, it urges the injunction is proper to prevent LEG

from taking ETC Tiger’s rights “without compensation or expropriation,” an

injustice the district court “intuitively recognized.”

An injunction shall be issued in cases where irreparable injury, loss,

or damage may otherwise result to the applicant. La. C.C.P. art. 3601 (A);

Dauphine v. Carencro High Sch., 02-2005 (La. 4/21/03), 843 So. 2d 1096,

176 Ed. L. Rep. 490; Terral v. AG Res. Holdings LLC, 54,156 (La. App. 2

Cir. 3/9/22), 335 So. 3d 1009. An injunction should issue only in those

instances where the applicant is threatened with irreparable loss or injury,

and is without adequate remedy at law. Terral v. AG Res. Holdings, supra;

Brannan v. Talbot, 29,692 (La. App. 2 Cir. 4/2/97), 691 So. 2d 848, writ

denied, 97-1419 (La. 9/19/97), 701 So. 2d 172. Irreparable injury is injury

or loss for which damages cannot be measured by a pecuniary standard or

adequately compensated in money damages. Shaw v. Hingle, 94-1579 (La.

1/17/95), 648 So. 2d 903; Terral v. AG Res. Holdings, supra. The burden of

proof at a hearing for preliminary injunction is a prima facie showing that
5

the applicant is entitled to relief. Rand v. City of New Orleans, 17-0596 (La.

12/6/17), 235 So. 3d 1077; Tanner v. Succession of Bourland, 52,918 (La.

App. 2 Cir. 11/20/19), 285 So. 3d 104.

On de novo review, we find the evidence insufficient to make a prima

facie case of irreparable loss, injury, or damage. ETC Tiger’s senior

director, Vedral, testified that pipeline crossings are routine and safe; no

witness testified that LEG would be unable to accomplish its LEMAC Farms

crossings safely. The encroachment project manager, Tinkle, said he was

confused because LEG submitted two crossing plans (one for a conventional

bore, the other for directional drilling), but he admitted that both satisfied

Energy Transfer’s crossing guidelines. In short, the record does not support

a finding of irreparable loss, injury, or damage to ETC Tiger’s existing

pipeline.

The vice-president of interstate engineering, Futch, testified the holes

that might be left by LEG’s operations created a “significant hazard for

landowners”; he suggested a cow could fall in. While this could be a source

of inconvenience, it did not stop LEMAC Farms from granting a lease to

LEG and is obviously “measurable by pecuniary standards.” Brannon v.

Talbot, supra.

Admittedly, LEG’s request for assessment and consent was rather

large, at 42 crossings, but it asked for this particular crossing to be

prioritized; Energy Transfer maintained an internal guideline for processing

all requests within 30 days and, moreover, asked for all documents to be sent

at one time. Even though the request may have been demanding, it was not,

on its face, unrealistic or lacking good faith.

6

Finally, ETC Tiger argues that this case is different from ETC Tiger,

NORWELA, and Ricks in that this permanent easement agreement conferred

the right to install multiple pipelines to its servitude, in addition to the one

already constructed and in operation. The contention is that LEG’s exercise

of its later pipeline servitude might affect ETC Tiger’s right to construct

future lines. On close review, we find that one of ETC Tiger’s witnesses,

Futch, the vice-president of interstate engineering, testified that ETC Tiger

has not surveyed or designed a second pipeline, has no plans to install a new

pipeline alongside the existing one, has not purchased additional rights on

adjoining properties, and has not consulted with the Federal Energy

Regulatory Commission about the construction of any new line. The

potential interference with ETC Tiger’s rights appears, at this point, no more

than hypothetical and does not approach a prima facie showing of

irreparable injury, loss, or damage. This argument lacks merit.

In short, even without the district court’s reading of Paragraph 4 as

conferring an “exclusive” servitude, the evidence does not support a finding

of irreparable loss, injury, or damage. This assignment of error has merit.

CONCLUSION

For the reasons expressed, the judgment granting a preliminary

injunction is reversed and the injunction is dissolved. The case is remanded

to the district court for further proceedings. All costs are assessed to the

appellee, ETC Tiger Pipeline LLC.

REVERSED AND REMANDED.