NOT DESIGNATED FOR PUBLICATION

STATE OF LOUISIANA
COURT OF APPEAL, THIRD CIRCUIT

06-1482

DOUGLAS ROBARGE, ET AL.

VERSUS

ENTERGY GULF STATES, INC., ET AL.

**********

APPEAL FROM THE
FIFTEENTH JUDICIAL DISTRICT COURT
PARISH OF LAFAYETTE, NO. 20013598
HONORABLE HERMAN C. CLAUSE, DISTRICT JUDGE

**********

ELIZABETH A. PICKETT
JUDGE

**********

Court composed of Oswald A. Decuir, Elizabeth A. Pickett, and J. David Painter,
Judges.

AFFIRMED.

John Allen Braymer
Attorney at Law
P. O. Box 2431
Baton Rouge, LA 70821
(225) 381-5844
Counsel for Defendant-Appellee:
Entergy Corporation
Entergy Thermal, LLC
Entergy Technology Holding Co.
Entergy Technology Co.
Entergy Power R S Corp.
Entergy Gulf States, Inc.
Entergy Enterprises, Inc.
Entergy Holdings, Inc.
Entergy Louisiana, Inc.
Entergy Operations Services, Inc.
Entergy Power & Light Company
Entergy Services, Inc.

Albert David Giraud
Ungarino & Eckert
3909 Plaza Tower Drive
Baton Rouge, LA 70816
(225) 292-2000
Counsel for Defendant-Appellant:
Telecable Associates, Inc.

Pickett, Judge.

The defendant, Telecable Associates, Inc., (Cox) appeals a judgment of the

trial court finding it liable to a co-defendant, Entergy Gulf States, Inc.

STATEMENT OF THE CASE

This suit arise from injuries sustained by Douglas Robarge. In its reasons for

ruling, the trial court succinctly set forth the facts applicable to this case:

ROBARGE was an employee of a transport company hired to
transport a large piece of oilfield equipment. The equipment, a metal
structure, was being transported along Highway 182 in Lafayette Parish.
ROBARGE was situated atop the metal structure as it was being moved
under utility wires (including ENTERGY and COX wires) hanging
across the highway. The ENTERGY line was energized with electricity;
the COX line was not.

Both lines were attached to a common anchor pole (telephone
company pole) on one side of the road, but traveled to different poles on
the other side of the road. The lines therefor hung at different angles
over the roadway; the structure being moved encountered the energized
ENTERGY line first.

The evidence establishes that at the point of the accident, the
structure was passing under the ENTERGY cable with two or three feet
of clearance, but the COX line was hanging too low for the equipment
to pass. The evidence indicates that ROBARGE was holding the COX
line with his leather-gloved right hand in an attempt to help lift the line
over the structure as it was moving forward.

The evidence further indicates that the COX line was either
“caught” by the moving structure or was being pulled up so tautly that
the common anchor pole (also supporting ENTERGY’S cable) was put
into a bind. This situation caused the “live” ENTERGY wire to sag, or
gallup down, and touch the structure. Electricity then traveled through
the metal structure and ROBARGE’S body, exiting through his
uninsulated hand to the COX line was holding. ROBARGE was injured
by the electrical shock.

Robarge filed suit against Entergy and Cox. After settling with Robarge for

$350,000.00, Entergy filed a cross-claim against Cox. The cross-claim alleged that

the licensing agreement allowing Cox to install its cables on the poles owned by

2

Entergy required Cox to indemnify Entergy for the damage caused to Robarge. Prior

to trial, Cox settled with Robarge. Thus, the only issue before the trial court at the

time of trial was Entergy’s claim for indemnification. The issue was submitted to the

trial court on briefs by agreement of the parties. On July 21, 2005, the trial court

issued written Reasons for Ruling finding that Entergy was entitled to

indemnification. After taking evidence regarding the amount of attorney fees due, the

trial court issued a judgment on January 17, 2006, against Cox in the amount of

$429,296.31. Cox appeals that judgment.

ASSIGNMENTS OF ERROR

The cross-defendant, Cox, asserts four assignments of error:

1. The trial court erred in finding that equipment from Cox was either
directly or indirectly involved in the accident involving Robarge, so as
to require Cox to indemnify Entergy for payments made to Robarge by
Entergy, and to reimburse Entergy for its attorney fees.

2. The trial court erred in not interpreting the indemnification provisions
in light of the entire Pole Attachment agreement.

3. The trial court erred in finding that the indemnification defense of active
negligence did not apply, so as to eliminate any requirement of
indemnification for this claim.

4. The trial court erred in refusing to find that the indemnification
provisions were against public policy.

DISCUSSION

In its first assignment of error, Cox essentially argues that the contractual

provision which provides for indemnification is inapplicable in this case. The

contractual provision at issue in this case is Article 19 of the licensing agreement. In

it, Cox is referred to as the “Licensee” and Entergy is referred to as the “Company.”

The article states:

Licensee agrees to indemnify and hold harmless Company, and

3

any and all agents, directors, officers, employees or servants of
Company, from: (a) any and all liability and claims for damages to
property, including, but not limited to, damage to property of Licensee,
Company or Telephone Company; and (b) any and all liability, claims,
payment, damages or loss, including attorneys’ fees and expenses,
because of, or related to, personal injuries or death, including, but not
limited to, injuries or death of third persons, employees of Licensee,
Company or Telephone Company: resulting directly or indirectly from
the operations of Licensee, or its contractors, or the employees of either,
in installing, repairing, maintaining, or removing of Licensee’s
equipment, or from the existence of Licensee’s equipment upon
Company’s poles or upon the poles of Telephone Company, or from the
presence of Licensee, or Licensee’s contractor, or the presence of the
employees of either, in the vicinity of Company’s facilities or equipment
wherever located, including, but not limited to, where located on
Company’s poles and on Telephone Company’s poles. In this
connection, Licensee hereby acknowledges notice that the wires and
other facilities of Company upon and between its poles, as well as
Company’s wires and other facilities upon and between Telephone
Company’s poles, at all times contain, and will continue to contain,
electric energy; and that it is dangerous to the life of any person for him
to contact such wires or other facilities upon or between said poles.

The payments and indemnities in this Section 19 shall apply
regardless of whether such liabilities, claims, payments, damages or
losses are caused, or contributed to, by the negligence of Licensee, or by
the negligence of Licensee’s contractors or of its invitees, or by the
negligence of the employees of either, and regardless of whether such
damages, liabilities, payments or losses are caused, in whole or in part,
or contributed to, by the acts or omissions of Company or by the agents,
directors, officers, employees or servants of Company, or by Telephone
Company, or by the agents, directors, officers, employees or servants of
Telephone Company.

Licensee shall carry insurance, in such form, and in companies
licensed to do business in the state of Louisiana, satisfactory to
Company, with contractual insurance endorsements necessary to protect
Licensee and Company and Telephone Company from and against any
and all claims, demands, actions, judgments, costs, expenses and
liabilities of every kind and nature, which may arise or result, directly
or indirectly, from or by reason of such loss, injury or damage, so as to
insure the liability of Licensee to Company its agents, directors, officers,
employees or servants of company under this Section 19. The amounts
of such insurance against liability due to damage to or destruction of
property shall be One Hundred Thousand Dollars ($100000.00) as to
any one claim and Three Hundred Thousand Dollars ($300,000.00) as
to any one occurrence, and against liability due to injury to or death of
persons Five Hundred Thousand Dollars ($500,000.00) as to any one

4

person, and One Million Dollars ($1,000,000.00) as to any one
occurrence. License shall also carry such insurance as will protect it
from all claims under any Workman’s Compensation Laws in effect that
may be applicable to it. All insurance required shall be procured before
any contact is made by Licensee with any of Company’s poles, and shall
remain in force for the entire life of this agreement. Licensee shall
submit to Company certificates by each company insuring Licensee to
the effect that such insurance company has insured Licensee for all
liabilities of Licensee under this numbered section, including the
contractual insurance requirement, and that such insurance carrier will
not cancel or change any policy of insurance issued to Licensee except
after thirty (30) days’ written notice by registered mail to Company; and
all such policies shall be replaced by Licensee with similar policies, to
be approved by Company, prior to their termination, or effective date of
cancellation. Failure of Licensee to so replace any such policy or
policies shall constitute a default by it under this agreement, and at
Company’s election, this agreement may be terminated upon ten days’
written notice from Company. Company may, at its election, require that
it be named as an additional insured in said policies, or either of them.
No policy required hereunder shall exclude liability for injury or
damages or death of an employee of Licensee, Company, or Telephone
Company, or exclude coverage for damages to property of Company or
Telephone Company.

Despite Cox’s argument to the contrary, the indemnification contract is clearly

applicable in this case. The “existence” of Cox’s wire on the poles in this case

required Robarge to lift the Cox wire above the equipment being hauled. The trial

court found that the act of lifting this wire caused the live Entergy line, which the

load had already passed under, to dip and come in contact with the load, which caused

Robarge’s injury. Had it not been for the existence of the low-lying Cox wire,

Robarge would not have been injured. This is a finding of fact pertinent to the

interpretation of the contract that cannot be reversed absent a finding of manifest

error. Brafa v. Christ, 05-270 (La.App. 3 Cir. 11/2/05), 915 So.2d 957. As we find

no error in the trial court’s finding, this assignment of error lacks merit.

In its second assignment of error, Cox argues that the court failed to interpret

the indemnity provision in the context of the entire agreement. Since the agreement

5

concerned primarily the installation, repair, maintenance, and removal of Cox’s wires

on Entergy’s poles, Cox argues that it is beyond the scope of the contract for Cox to

indemnify Entergy merely for the existence of Cox’s wires on Entergy’s poles.

In McGoldrick v. Lou Ana Foods, Inc., 94-400, pp.4-5 (La.App. 3 Cir.

11/2/94), 649 So.2d 455, 458, this court stated:

When a clause in a contract is clear and unambiguous, the letter of the
clause should not be disregarded under the pretext of pursuing its spirit.
[Evangeline Parish School Board v. Energy Contracting Services, Inc.,
617 So.2d 1259 (La.App. 3d Cir.), writ denied, 624 So.2d 1228
(La.1993).] It will not be presumed by the court that parties make use
of words in their contracts to which no meaning is attached by them.
Weeks v. T.L. James & Co., Inc., [626 So.2d 420 (La.App. 3d Cir.1993),
writ denied, 630 So.2d 794 (1994).]

We find that the language in article 19 is not ambiguous and clearly provides for

indemnification in this case. This assignment of error lacks merit.

In its third assignment of error, Cox argues that indemnification is not available

to a party who is “actively negligent.” The cases cited by Cox all deal with indemnity

in tort, not contractual indemnity. Furthermore, Cox misstates the contents of the

agreement in its brief when it says, “the contract in question does not contemplate the

active negligence of Entergy[.]” In fact, the second paragraph of article 19 states:

The payments and indemnities in this Section 19 shall apply . . .
.regardless of whether such damages, liabilities, payments or losses are
caused, in whole or in part, or contributed to, by the acts or omissions
of Company or by the agents, directors, officers, employees or servants
of Company[.]

This clause clearly contemplates a situation like the one here where Entergy’s own

negligence is a factor in causing the damage for which it seeks indemnity. This

assignment of error lacks merit.

In its final assignment of error, Cox argues that the indemnification agreement

is against public policy insofar as it requires indemnification when the telephone

6

company, rather than Entergy, owns the poles to which the lines are attached. The

problem is, Cox does not say what public policy is offended by this agreement. The

trial court did not reach the merits of this issue, finding that only the Public Service

Commission, which has authority to regulate the terms of pole attachment

agreements, could resolve the issue. The trial court cited Louisiana Cablevision v.

Louisiana Public Service Commission, 493 So.2d 555 (La.1986). In that case, the

supreme court did find that the Public Service Commission had the authority to

regulate pole attachment agreements.

Cox has not shown, and we fail to find, that any portion of this agreement is

against public policy. This assignment of error lacks merit.

CONCLUSION

The judgment of the trial court is affirmed in all respects. Costs of this appeal

are assessed to Telecable Associates, Inc.

AFFIRMED.

This opinion is NOT DESIGNATED FOR PUBLICATION.