John Thibodeaux and Amy Thibodeaux, Indiv. and O/B/O Emily Thibodeaux and Gabrielle Thibodeaux v. Gulfgate Construction, LLC
John Thibodeaux and Amy Thibodeaux, Indiv. and O/B/O Emily Thibodeaux and Gabrielle Thibodeaux v. Gulfgate Construction, LLC, No. CA-0017-0494 (La. Ct. App. 3d Cir. Nov. 22, 2017).
Authorities cited
Identified automatically; this list may not be exhaustive.
- Greemon v. City of Bossier City 65 So. 3d 1263
- Weatherly v. Fonseca & Associates, L.L.C. 48 So. 3d 394
- Gabriel v. La. Organ Procurement, 2010-2515 (La. 1/7/11) 52 So. 3d 887
- Bellsouth Telecom. v. Eustis Engineering 974 So. 2d 749
- Cormier v. Albear 758 So. 2d 250
- Christy v. McCalla 79 So. 3d 293
- Pinsonneault v. Merchants & Farmers Bank & Trust Company 816 So. 2d 270
- In Re Pastorek 944 So. 2d 564
Opinion text
STATE OF LOUISIANA
COURT OF APPEAL, THIRD CIRCUIT
17-494
JOHN THIBODEAUX AND AMY THIBODEAUX,
INDIVIDUALLY AND ON BEHALF OF EMILY
THIBODEAUX AND GABRIELLE THIBODEAUX
VERSUS
GULFGATE CONSTRUCTION, LLC, ET AL.
**********
APPEAL FROM THE
FIFTEENTH JUDICIAL DISTRICT COURT
PARISH OF LAFAYETTE, NO. 2015-4167
HONORABLE JULES D. EDWARDS, III, DISTRICT JUDGE
**********
PHYLLIS M. KEATY
JUDGE
**********
Court composed of Ulysses Gene Thibodeaux, Chief Judge, Phyllis M. Keaty, and
Candyce G. Perret, Judges.
AFFIRMED.
Melvin A. Eiden
Rabalais & Hebert
701 Robley Drive, Suite 210
Lafayette, Louisiana 70503
(337) 981-0309
Counsel for Defendant/Appellant:
J. M. Drilling LLC
Max J. Cohen
Melanie Lockett
Lowe, Stein, Hoffman, Allweiss & Hauver, L.L.P.
701 Poydras Street, Suite 3600
New Orleans, Louisiana 70139-3600
(504) 581-2450
Counsel for Defendant/Appellee:
Water & Wastewater Utilities, Inc.
Janice M. Reeves
Maricle & Associates
III United Plaza, Suite 350
8545 United Plaza Boulevard
Baton Rouge, Louisiana 70809
(225) 924-9585
Counsel for Defendant/Appellee:
Gulfgate Construction, LLC
Max Michael Menard
Attorney at Law
200 Church Street
Post Office Box 1196
Youngsville, Louisiana 70592
(337) 857-6123
Counsel for Plaintiffs/Appellees:
John Thibodeaux
Amy Thibodeaux
Gabrielle Thibodeaux
Emily Thibodeaux
Edward Taulbee
Attorney at Law
Post Office Box 2038
Lafayette, Louisiana 70502-2038
(337) 269-5005
Counsel for Plaintiffs/Appellees:
John Thibodeaux
Amy Thibodeaux
Gabrielle Thibodeaux
Emily Thibodeaux
Pierre M. Legrand
Marshall G. Weaver
Legrand Law Firm
3939 North Causeway Boulevard, Suite 204
Metairie, Louisiana 70002
(504) 304-9499
Counsel for Intervenor/Appellee:
Bellsouth Telecommunications, LLC
KEATY, Judge.
Defendant/Appellant, J. M. Drilling LLC (J. M. Drilling), appeals the trial
court’s granting of a motion for summary judgment in favor of Defendant/Appellee,
Water & Wastewater Utilities, Inc. (Wastewater). For the following reasons, the
trial court’s judgment is affirmed.
FACTS AND PROCEDURAL BACKGROUND
This negligence matter arose on June 9, 2015, when Plaintiff, John
Thibodeaux, injured his right leg while splicing fiber optic cable on behalf of his
employer, American Telephone & Telegraph (AT&T), at 114 Meadow Gate Drive
in the Sawgrass subdivision in Lafayette, Louisiana. Thibodeaux had to access
hand holes, which are rectangular, underground vaults where fiber optic cables
come together and are spliced. The two hand holes at issue were equipped with
covers that rested on top of the ground. They were located near a rectangular, pre-
cast slab which held an AT&T cabinet. On the day of his accident, Thibodeaux
lifted a hand hole cover and placed it by the AT&T cabinet when the ground
beneath him gave way, causing his right leg to fall into a hole, sustaining injury.
Prior to Thibodeaux’s accident, Gulfgate Construction, LLC (Gulfgate
Construction), and J. M. Drilling performed work on the property pursuant to
separate contracts with AT&T. Gulfgate Construction’s job, which was the F1 part
of the project, consisted of preparing a pre-cast slab, installing a cabinet on top of
the pre-cast slab, digging two hand holes, and feeding fiber optic cable into hand
hole number two. After Gulfgate Construction finished its job, J. M. Drilling
performed the F2 part of the project, which consisted of installing fiber optic cable
by accessing the hand holes and feeding the cable out to the rest of the subdivision.
It is alleged that during operations, Gulfgate Construction and/or J. M.
Drilling struck and damaged an underground sewer force main line. The main line
purportedly began leaking and caused a washout under the pre-cast slab upon
which the AT&T cabinet was situated, ultimately forming the hole into which
Thibodeaux fell. The main line, which ran from a sewer lift station on the property
to the street, belonged to Wastewater, the owner and operator of the lift station.
Gulfgate Construction repaired Wastewater’s broken main line after Thibodeaux’s
accident. Wastewater had not marked its main line prior to the commencement of
work performed by Gulfgate Construction and J. M. Drilling. The hand holes had
to be repositioned as a result of the existence of the underground main line.
On August 24, 2015, Thibodeaux and his wife, Amy, individually and on
behalf of their minor daughters, Gabrielle and Emily, filed suit against Gulfgate
Construction, Milton Water System, Inc., and Wastewater. Gulfgate Construction
is the subject of a separate appeal in this court in Docket Number 17-495. Milton
Water System, which has been dismissed, is not the subject of either appeal. On
October 8, 2015, Thibodeaux amended his lawsuit, adding J. M. Drilling as a
defendant.
On August 23, 2016, Wastewater filed a Motion for Summary Judgment. It
was granted for reasons cited in open court by the trial court following a hearing
which occurred on January 30, 2017. On that same day, the trial court signed a
written judgment dismissing Wastewater from the matter, based upon its finding
that “there is no genuine issue of material fact that [Wastewater] is not liable for
the damages sued upon.” J. M. Drilling appealed.
On appeal, J. M. Drilling alleges the following assignments of error:
2
1. The trial court erred when it granted Wastewater’s Motion for
Summary Judgment since Wastewater failed to uphold its
statutory duty to mark its lines when notified by Louisiana One[]
Call when its underground facilities may be implicated.
2. The trial court erred in granting Wastewater’s Motion for
Summary Judgment as the question of whether the failure of
Wastewater to mark its lines was a concurrent, causal factor to
the injury suffered by Thibodeaux is a question of fact that the
jury should decide.
3. The trial court erred in granting Wastewater’s Motion for
Summary Judgment based in part on the status of Louisiana
One Call as a non-defendant.
STANDARD OF REVIEW
“Appellate courts review summary judgments de novo, using the same
criteria that govern the district court’s consideration of whether summary judgment
is appropriate.” Greemon v. City of Bossier City, 10-2828, 11-39, p. 6 (La. 7/1/11),
65 So.3d 1263, 1267. A summary judgment “shall be granted if the motion,
memorandum, and supporting documents show that there is no genuine issue as to
material fact and that the mover is entitled to judgment as a matter of law.”
La.Code Civ.P. art. 966(A)(3). “The only documents that may be filed in support
of or in opposition to the motion are pleadings, memoranda, affidavits, depositions,
answers to interrogatories, certified medical records, written stipulations, and
admissions.” La.Code Civ.P. art. 966(A)(4). “The burden of proof rests with the
mover.” La.Code Civ.P. art. 966(D)(1). If the mover will not bear the burden of
proof at trial on the matter at issue, however, his burden on the motion for
summary judgment “does not require him to negate all essential elements of the
adverse party’s claim, action, or defense, but rather to point out to the court the
absence of factual support for one or more elements essential to the adverse party’s
claim, action, or defense.” Id. Specifically, “[t]he burden is on the adverse party
3
to produce factual support sufficient to establish the existence of a genuine issue of
material fact or that the mover is not entitled to judgment as a matter of law.” Id.
DISCUSSION
I. First Assignment of Error:
In its first assignment of error, J. M. Drilling contends the trial court erred
when it granted the Motion for Summary Judgment because Wastewater failed to
uphold its statutory duty under the Louisiana Underground Utilities and Facilities
Damage Prevention Law to mark its lines when notified by Louisiana One Call
when its underground facilities may be implicated.
The Louisiana Underground Utilities and Facilities Damage Prevention Law
(Damage Prevention Law) is governed, in part, by La.R.S. 40:1749.11-1749.14 and
its “goal is to protect the public from damage resulting from the underground
utilities being damaged.” Weatherly v. Fonseca & Assocs., L.L.C., 10-495, p. 2
(La.App. 3 Cir. 10/6/10), 48 So.3d 394, 395-96, writ denied, 10-2497 (La. 1/7/11),
52 So.3d 887. It requires excavators to “ascertain the location of underground
facilities by calling the notification center, known as ‘Louisiana One Call,’ at least
forty-eight but not more than 120 hours prior to excavation.” Bellsouth
Telecomms., Inc. v. Eustis Eng’g Co., Inc., 07-865, pp. 2-3 (La.App. 4 Cir.
12/19/07), 974 So.2d 749, 750. The parties in this matter refer to this request as a
“DOTTIE.” After Louisiana One Call receives the call, the “utility operators are
notified and given a ‘mark by’ date by which the utilities must mark the locations
of their underground cables, etc., so the excavator will not damage the
underground utilities.” Id.
“Louisiana courts use a duty-risk analysis in negligence cases to determine
whether liability exists under the facts of a particular case.” Cormier v. Albear, 99-
4
1206, p. 6 (La.App. 3 Cir. 2/2/00), 758 So.2d 250, 254. Under this analysis, a
plaintiff is required to prove five separate elements:
(1) the defendant had a duty to conform his or her conduct to a
specific standard of care; (2) the defendant failed to conform his or
her conduct to the appropriate standard of care; (3) the defendant’s
substandard conduct was a cause-in-fact of the plaintiff’s injuries; (4)
the defendant’s substandard conduct was a legal cause of the
plaintiff’s injuries; and (5) actual damages.
Christy v. McCalla, 11-366, pp. 8-9 (La. 12/6/11), 79 So.3d 293, 299 (citing
Pinsonneault v. Merchs. & Farmers Bank & Trust Co., 01-2217, p. 6 (La. 4/3/02),
816 So.2d 270, 275-76). “The threshold issue in any negligence action is whether
the defendant owed the plaintiff a duty, and whether a duty is owed is a question of
law.” Hanks v. Energy Corp., 06-477, p. 21 (La. 12/18/06), 944 So.2d 564, 579.
“Whether the defendant breached that duty and whether that breach was a cause in
fact of plaintiff’s injuries are factual questions to be determined by the factfinder.”
Id. at 580.
In this case, our inquiry is whether Wastewater owed Thibodeaux a duty
under the Damage Prevention Law to mark its main line in conjunction with work
performed by J. M. Drilling on the property in question. On appeal, Wastewater
contends that it did not owe a duty to mark its main line prior to the
commencement of J. M. Drilling’s work because it was not notified by Louisiana
One Call regarding work to be performed on the property in question. In support,
Wastewater offered into evidence at the hearing the affidavit of its employee and
supervisor, Randy Savoy. Savoy explained that, prior to excavating land, a
contractor is required to obtain a DOTTIE, which requests the owners of
underground utilities to mark them so that they will not be damaged during the
excavation process. Savoy attested that Wastewater, as the owner of the
5
underground main line, was never requested to mark its lines pursuant to any
DOTTIE requests prior to June 9, 2015, the date of Thibodeaux’s accident. Savoy
attested that Wastewater had not excavated or performed any work at the property
prior to August 31, 2015, the date Wastewater was served the petition herein.
On the other hand, J. M. Drilling contends that Wastewater received
notification from Louisiana One Call in connection with two DOTTIEs requested
by Gulfgate Construction regarding work that it was going to perform on the
property. At the hearing, J. M. Drilling offered into evidence two DOTTIEs, i.e.,
Louisiana One Call System Ticket Numbers 150016857 and 150047467, which
were requested by Gulfgate Construction on January 13, 2015 and February 3,
2015. These two DOTTIEs were for work that was to be performed on January 16,
2015 through February 5, 2015, and February 6, 2015 through February 26, 2015,
at the intersection of Meadow Gate Drive and Timber Bark Road. Both DOTTIEs
listed Wastewater under the section entitled “Members Notified.” J. M. Drilling
offered no evidence indicating that Wastewater actually received notification from
Louisiana One Call. Therefore, Wastewater’s argument regarding lack of notice,
supported by Savoy’s affidavit, remained undisputed at the hearing. We find no
error with the trial court’s finding in this regard.
J. M. Drilling also submitted into evidence three additional DOTTIEs, i.e.,
Louisiana One Call System Ticket Numbers 150049468, 150086745, and
1501225566, which were requested by J. M. Drilling on February 4, 2015,
March 13, 2015, and March 26, 2015, for work to be performed at the intersection
of Meadow Gate Drive and Timber Bark Road. The work was to occur from
February 9, 2015 through March 1, 2015, from March 6, 2015 through March 26,
2015, and from March 31, 2015 through April 20, 2015. Unlike the two DOTTIEs
6
requested by Gulfgate Construction, Wastewater was not listed as a member to be
notified on the three DOTTIEs requested by J. M. Drilling. The trial court
recognized that a duty cannot be breached if the duty did not exist, by stating:
You can’t mark the line if you’re not notified to mark the line.
First you have to say, I’m somebody who needs to be notified. If I’m
notified I know I have to mark the line. If they did not receive any
notification, then how do they know to mark the line. They didn’t
know to mark the line, they didn’t breach that duty to mark the line
after being notified.
The trial court did not err in this regard.
Accordingly, J. M. Drilling’s first assignment of error is without merit.
II. Second Assignment of Error:
In its second assignment of error, J. M. Drilling contends the trial court erred
in granting Wastewater’s Motion for Summary Judgment as the question of
whether its failure to mark its lines was a concurrent, causal factor to the injury
suffered by Thibodeaux is a question of fact that the jury should decide.
In opposition, Wastewater contends that even if it breached any purported
duty, that breach failed to cause any damage because J. M. Drilling knew or should
have known of the underground main line even though it was unmarked. At trial,
Wastewater offered into evidence the deposition testimony of Kevin Elfring, J. M.
Drilling’s Supervisor/Project Manager. Elfring explained that J. M. Drilling, an
authorized dealer for AT&T, is a fiber optic communication company that provides
directional drilling and also buries communication wires. According to Elfring’s
testimony, his involvement with J. M. Drilling’s work on the property in February
2015 included organizing it, laying it out, and getting the equipment to the site.
Elfring explained that the project’s plans included a lift station and a manhole
cover, which meant that a main line was also present on the property. Elfring
7
testified that protocol requires Louisiana One Call to be notified in order to have a
sewer line marked. He indicated that if it was unmarked despite Louisiana One
Call being notified, the next step would be to identify the owner of the lift station,
call them, and ask them to mark the line.
Elfring’s testimony is supported by the deposition testimony of Gulfgate
Construction employees, John Smith and Harold Broussard, submitted into
evidence at the hearing by Wastewater. Smith stated that the property at issue was
a utility lot, which means a contractor must be more cautious and more aware of
digging because of the existence of things buried undergound. He revealed the
existence of the lift station and manhole cover meant the existence of a sewer line.
Smith agreed that even if lines are not marked despite a DOTTIE request, any
person in the business should recognize that caution should be used. Smith further
recalled seeing a white, two-inch polyvinyl chloride (PVC) pipe as he was digging
a hole.
Broussard testified that the existence of a lift station on the property meant
that a sewer line likely existed underground and ran from the back of the fence to
the road. He stated that a person digging and excavating needed to use caution
because of the existence of lines running throughout the property. Broussard noted
his boss told him that “there was a pipe there, two-inch pipe, just to be careful.”
Wastewater also submitted the deposition testimony of Adam Romero,
another Gulfgate Construction employee. Romero testified that he worked with
Smith in January 2015 on the property. According to his testimony, Romero was
aware of the lift station, which meant there would be lines running from it to the
street. Romero agreed that anybody in the business would need to exercise caution
to prevent hitting underground pipes, regardless of whether they were marked or
8
unmarked. Romero recalled digging the hand hole with Smith and discovering a
two-inch PVC pipe. According to Romero’s testimony, upon uncovering the pipe,
they called their supervisor, Kelly Vice.
The foregoing testimony and evidence shows that any purported breach by
Wastewater did not cause any damage to Thibodeaux because J. M. Drilling knew
or should have known of the underground main line even though it was unmarked.
The trial court did not err in this regard.
Accordingly, J. M. Drilling’s second assignment of error is without merit.
III. Third Assignment of Error:
In its third assignment of error, J. M. Drilling contends the trial court erred
in granting Wastewater’s Motion for Summary Judgment based, in part, on the
status of Louisiana One Call as a non-defendant. J. M. Drilling’s alleged error is
based upon the trial court’s statement at the hearing, as follows: “If Louisiana One
Call were also a defendant, then your motion for summary judgment should be
denied.”
In this case, a reading of the entire trial court transcript indicates that its
ultimate decision was not based upon the trial court’s one-sentence statement made
at the beginning, and prior to hearing all of the evidence. Rather, it was made at
the end of hearing all of the evidence and testimony. The trial court dismissed
Wastewater based upon Thibodeaux and/or J. M. Drilling’s failure to prove the
required elements under the duty-risk analysis. We find the trial court did not err
in this regard.
Accordingly, J. M. Drilling’s third assignment of error is without merit.
9
DECREE
The trial court’s judgment in favor of Defendant/Appellee, Water &
Wastewater Utilities, Inc., is affirmed. All costs of this appeal are assessed to
Defendant/Appellant, J. M. Drilling LLC.
AFFIRMED.