James M. Biglane and Charlotte Biglane Nobile v. Board of Commissioners Fifth Louisiana Levee District
James M. Biglane and Charlotte Biglane Nobile v. Board of Commissioners Fifth Louisiana Levee District, No. CA-0018-0100 (La. Ct. App. 3d Cir. Sept. 26, 2018).
Authorities cited
Identified automatically; this list may not be exhaustive.
- Hyatt v. Mutual of Omaha Ins. Co. 149 So. 3d 406
- Fishbein v. State 960 So. 2d 67
- Bucktown Marina, L.L.C. v. Parish of Jefferson 959 So. 2d 495
- Bucktown Marina, L.L.C. v. Parish of Jefferson 959 So. 2d 505
- Sher v. Lafayette Ins. Co. 988 So. 2d 186
- Walker v. Hixson Autoplex of Monroe, L.L.C. 245 So. 3d 1088
- DeSambourg v. BOARD OF COM'RS 621 So. 2d 602
Opinion text
STATE OF LOUISIANA
COURT OF APPEAL, THIRD CIRCUIT
18-100 consolidated with 18-101
JAMES M. BIGLANE AND
CHARLOTTE BIGLANE NOBILE
VERSUS
BOARD OF COMMISSIONERS, FIFTH
LOUISIANA LEVEE DISTRICT, ET AL.
**********
APPEAL FROM THE
SEVENTH JUDICIAL DISTRICT COURT
PARISH OF CONCORDIA, NO. 44712
HONORABLE JOHN C. REEVES, DISTRICT JUDGE
**********
BILLY HOWARD EZELL
JUDGE
**********
Court composed of Billy Howard Ezell, Shannon J. Gremillion, and D. Kent Savoie,
Judges.
APRIL 24, 2017 JUDGMENT REVERSED AND
RENDERED; JUNE 19, 2017 JUDGMENT
REVERSED.
Randall Alan Smith
Tiffany Hawkins Davis
Mary Nell Bennett
Smith & Fawer
201 St. Charles Ave., Suite 3702
New Orleans, LA 70170
(504) 525-2200
COUNSEL FOR PLAINTIFFS/APPELLEES:
James M. Biglane
Charlotte Biglane Nobile
Patrick Bayard McIntire
Oats & Marino
100 East Vermilion Street, Suite 400
Lafayette, LA 70501
(337) 233-1100
COUNSEL FOR DEFENDANT/APPELLANT:
Board of Commissioners for the Fifth Louisiana Levee District
Madaline Cross Gibbs
Seventh Judicial District Court Assistant District Attorney
P.O. Box 600
Harrisonburg, LA 71340
(318) 336-5526
COUNSEL FOR DEFENDANT/APPELLANT:
Board of Commissioners for the Fifth Louisiana Levee District
John D. Crigler, Jr.
Bishop Paxton Crigler & Moberley
P.O. Box 97
St. Joseph, LA 71366
(318) 766-4892
COUNSEL FOR DEFENDANT/APPELLANT:
Board of Commissioners for the Fifth Louisiana Levee District
EZELL, Judge.
These consolidated appeals concern the taking of land by the Fifth Louisiana
Levee District Board of Commissioners (FLD) for a project to raise and strengthen
the levee in Concordia Parish lying between Louisiana Highway 131 and the
Mississippi River. At issue is whether the property used for the project was un-
compensable batture pursuant to La.Const. Art. 6, § 42, and whether the property
had been previously appropriated. Additionally, there is the issue of whether the
FLD should have raised these issues as affirmative defenses, resulting in the
exclusion of much of its evidence. The award of attorney fees and costs are also at
issue.
FACTS
James Biglane and his sister, Charlotte Biglane Nobile, (collectively referred
to as the Biglanes) co-owned approximately 3,000 acres of land in Concordia Parish
next to the Mississippi River. The property is known as the Scotland and Genevieve
Plantations. A levee existed on the property. Pursuant to La.R.S. 38:281(6), a levee
district is “a political subdivision of this state organized for the purpose and charged
with the duty of constructing and maintaining levees, and all other things incidental
thereto within its territorial limits.”
Pursuant to its authority under La.R.S. 38:281(6), the FLD sent a letter to the
Biglanes on July 14, 2008, notifying them that on July 9, 2008, the FLD adopted a
Resolution of Appropriation for Louisiana lands required for rights-of-way for a
project known as Levee Enlargement and Berms, Item 361-R. The FLD attached
information to the letter indicating that it needed approximately eighty acres of dirt
from the Biglanes’ property for the project.
Jason Trichelle, superintendent of operations for the FLD, testified that the
FLD’s primary responsibility is to maintain the Mississippi River levee and the
Concordia backwater levee. He stated that the levee on the Biglane property was an
intact levee but deficient in regard to the rest of the system. Mr. Trichelle explained
that a record flood occurred in 2011 and, had the project at issue not been completed,
it would have impacted all of Concordia Parish, including the Biglane property. Mr.
Trichelle testified that the federal government pays for construction of the levee and
the levee districts acquire the needed land, which is paid for by the State. He
explained that the Corps of Engineers determines the least environmental impact and
best potential borrow area and sends a right-of-way request to the levee district. The
Louisiana Department of Transportation and Development (DOTD) prepares the
ownership map and prepares the batture determination. The DOTD then determines
whether the property should be appropriated or expropriated. Subsequently, the
FLD determines the compensation based on appropriation or expropriation.
Lee Hines, vice president of Chustz Surveying, testified that his company
performed a topographic survey of the property for the project. He presented the
survey results to the Corps of Engineers indicating the elevation of the property.
Terry Lightsey, a licensed surveyor, was asked to determine the locations
where dirt was previously removed from the property and draw a right-of-way map.
To perform this task, he used old maps from the FLD and Corps of Engineers. Mr.
Lightsey went to the property in May 2007 and measured distances based on the
older maps to determine what right-of-way had previously been acquired versus
what right-of-way was needed for the project. He explained that the area needed for
the project was Parcel 3-3 on the river side of the levee, which contained 65.145
acres, and Parcel 3-2 on the land side of the levee, which contained 17.223 acres.
2
Paul Colquette, a civil engineer who worked with the DOTD, was asked to
calculate the amount of batture in Parcel 3-3. He explained that the DOTD serves
as the engineer for levee districts. He determined that there were 22.7 acres of
batture outside the existing right-of-way in Parcel 3-3.
David Gullette, a real estate appraiser, appraised Parcels 3-2 and 3-3 of the
Biglane property using the information from Mr. Lightsey and Mr. Colquette. He
determined that Parcel 3-2, the land side, had a value of $5,500.00 an acre and Parcel
3-3, the river side, had a value of $3,300.00 an acre. He also took into consideration
improvements on the land and the amount of batture which was needed. On
February 27, 2009, the FLD sent a letter making an offer to the Biglanes for Parcels
3-2 and 3-3 for $335,287.00 for the property for the Mississippi River Levee Raising
Project Item 361-R based on Mr. Gullette’s appraisal.
Unsatisfied with the determinations of batture and prior takings, the Biglanes
filed suit on July 2, 2009, seeking compensation and damages for the taking of their
property. Named as defendants were the FLD and the DOTD. On September 25,
2013, the Biglanes filed a motion for partial summary judgment, requesting that the
trial court declare that their property is neither subject to a pre-existing servitude,
nor is it batture. The Biglanes filed another motion for partial summary judgment
on December 18, 2015, asking that the trial court render judgment that the FLD owes
compensation for the areas it claims are batture and subject to a pre-existing
servitude. Summary judgment was denied on February 29, 2016.
On May 16, 2016, the FLD and the DOTD filed a motion for partial summary
judgment asking that the court enter judgment that the property is riparian; that the
ordinary high water mark is 62 feet at the property, with all property on the river side
of the levee below that elevation being batture; and that the acreage on the river side
3
of the levee that is above 62 feet is just under fourteen acres. The trial court entered
judgment denying the motion for summary judgment on July 15, 2016.
After a five-day trial in November 2016, the trial court rendered judgment
dismissing the DOTD. Having deferred its ruling on existence of batture or of a pre-
existing servitude until the end of trial, the trial court stated in reasons for judgment
that it was not allowing any evidence as to these issues, ruling that they were
affirmative defenses that had not been pled. The trial court further stated that, even
if the evidence had been admissible, the FLD failed to meet its burden of proof
regarding the issues of batture or a pre-existing servitude. Judgment was rendered
on April 24, 2017, in favor of the Biglanes and against the FLD in the amount of
$1,397,500.00, subject to a credit of $335,287.00, which was paid on June 25, 2013.
At the request of the parties, attorney fees, expert fees, and costs were to be
determined later. A judgment was rendered pursuant to La.R.S. 38:301(C)(2)(f) on
June 15, 2017, awarding $265,553.25 in attorney fees based on a calculation of 25%
of the net amount of judgment, which was $1,062,213.00 after the credit. An
amended judgment was signed on June 19, 2017, to correct a clerical error. The
FLD appealed the judgment of the trial court, and the Biglanes answered the appeal.
EVIDENTARY RULINGS
The FLD first claims that the trial court erred in finding that batture is an
affirmative defense that must be raised in the pleadings and excluding evidence on
this issue. The FLD argues that batture is a criterion used to calculate just
compensation for a riparian levee appropriation. Fourteen exhibits pertaining to
batture were excluded from the evidence but were admitted as proffered evidence
during the presentation of evidence and again, by the FLD, at the close of trial. Of
4
the fourteen exhibits, the FLD argues that seven of them were improperly excluded
as to the issue of batture.
An affirmative defense must be specifically pled in the answer. La.Code
Civ.P. art. 1005. “The determination of whether an issue is an affirmative defense
is a question of fact resolved by examining the circumstances of the individual case.”
Hyatt v. Mutual of Omaha Ins. Co., 14-282, p. 14 (La.App. 3 Cir. 10/1/14), 149
So.3d 406, 415. “[A]n affirmative defense raises a new matter or issue that will
defeat the plaintiff’s claim on the merits, even assuming that claim is valid and that
the allegations of the petition are true.” Fishbein v. State ex rel. LSU Health Sciences
Ctr., 06-549, p. 6 (La.App. 1 Cir. 3/9/07), 960 So.2d 67, 71-72, writs denied, 07-730,
07-708 (La. 6/22/07), 959 So.2d 495, 959 So.2d 505. “The new matter must be one,
however, that is not raised in the plaintiff’s petition.” Sher v. Lafayette Ins. Co., 07-
2441, 07-2443, p. 23 (La. 4/8/08), 988 So.2d 186, 204. A defendant need not raise
an issue that is not a new matter. Fishbein, 960 So.2d 67. “Where a defense to a
plaintiff’s claim arises by operation of the very law under which the plaintiff is
seeking recovery, the defense need not be affirmatively pleaded and there can be no
unfair surprise, since no one may avail himself of ignorance of the law.” Id. at 72.
Louisiana Constitution Article 6, § 42(A)(emphasis added) provides for
compensation for land used or destroyed for levee purposes as follows:
Notwithstanding any contrary provision of this constitution, lands and
improvements thereon hereafter actually used or destroyed for levees
or levee drainage purposes shall be paid for as provided by law. With
respect to lands and improvements actually used or destroyed in the
construction, enlargement, improvement, or modification of federal or
non-federal hurricane protection projects, including mitigation related
thereto, such payment shall not exceed the amount of compensation
authorized under Article I, Section 4(G) of this constitution. However,
nothing contained in this Paragraph with respect to compensation
for lands and improvements shall apply to batture or to property the
control of which is vested in the state or any political subdivision for
5
the purpose of commerce. If the district has no other funds or resources
from which the payment can be made, it shall levy on all taxable
property within the district a tax sufficient to pay for property used or
destroyed to be used solely in the district where collected.
Furthermore, La.R.S. 38:301(C)(1)(a)(emphasis added) also provides for
compensation taken for levee purposes and provides: “[a]ll lands, exclusive of
batture, and improvements hereafter actually taken, used, damaged, or destroyed
for levee or levee drainage purposes shall be paid for at fair market value to the full
extent of the loss.”
The Biglanes are claiming compensation for property taken for levee
enlargement purposes. Payment for batture is specifically excluded by statute. As
explained in Fishbein, 960 So.2d at 72, “it is simply part of the mandatory statutory
framework” that determines compensation for land taken or destroyed for levee
purposes. The trial court erred in finding that the FLD had to plead the issue of
batture as an affirmative defense and in excluding evidence on that issue.
In its written reasons, the trial court stated that it was excluding evidence
based on the Biglanes’ objections for failure to plead affirmative defenses prior to
trial. On appeal, the Biglanes complain that the trial court could have excluded the
evidence of batture on other grounds they asserted at trial, including hearsay,
authenticity, cumulative effect, demonstrative only, relevance, and lack of
foundation. However, the Biglanes do not brief this argument. According to the
Uniform Rules-Louisiana Courts of Appeal, Rules 2-12.4 and 2-12.5, issues not
briefed on appeal are deemed abandoned.
Regardless, we do find that the seven exhibits would have been properly
admissible. Exhibits D-18, D-19, and D-20 were prepared by Mr. Colquette and
offered during his testimony. He explained that the DOTD serves as the engineer
6
for levee districts. The documents were maps prepared by Mr. Colquette and the
information he used in calculating what constituted batture. Mr. Colquette testified
at trial regarding the information and process he used in preparing the documents.
Exhibit D-24 was prepared by Michael Mayeaux, an expert land surveyor who
testified at trial. It is a topographic survey based on Mr. Lightsey’s calculations. Mr.
Mayeaux’s survey indicates his calculation of the area of non-compensable batture.
Exhibits D-25 and D-26 were prepared by the Biglanes’ expert, Dr. Frank
Willis, as part of his report but admitted during the testimony of Mr. Mayeaux. The
exhibits were LIDAR images using two different high-water elevations. Exhibit D-
34 is a photograph taken by Dr. Willis of the property, who testified that he went to
the property and took the picture from a canoe. At trial, Dr. Willis explained that
the picture was taken in 2015, after the levee work was performed. These witnesses
authenticated the documents and were subject to cross-examination.
STANDARD OF REVIEW
Having determined that the trial court should have considered the above
excluded evidence, we will now determine if the evidence affects the judgment. If
the exclusion of evidence taints a trial court’s review, the reviewing court should
conduct a de novo review of the admissible evidence to ensure a fair trial and a fair
judgment. Walker v. Hixson Autoplex of Monroe, L.L.C., 51,758 (La.App. 2 Cir.
11/29/17), 245 So.3d 1088. Not every evidentiary exclusion requires a de novo
review. Id. A de novo review should be limited to those circumstances where “the
error prejudiced or tainted the trial court’s finding with regard to a material factual
issue.” Id. at 1094.
In the present case, the trial court stated in written reasons for judgment that
even if it considered the excluded evidence, it would find that the FLD failed to meet
7
its burden of proof regarding batture. The trial court had the benefit of viewing the
proffered evidence and hearing the testimony in this case. Therefore, we find it
appropriate to apply the manifest error standard of review to the trial court’s findings
as the trial court allowed FLD to put forth evidence regarding batture, deferring
ruling on its admissibility until after the trial.
BATTURE
Louisiana Civil Code Article 665 provides for a legal public servitude for the
making or repairing of levees on the shores of navigable rivers. Louisiana
Constitution Article 6, Section 42, “exempts the state and political subdivisions from
compensating riparian landowners for the exercise of its levee servitude when the
lands actually used or destroyed for levee or levee purposes are ‘batture.’”
DeSambourg v. Bd. of Com’rs for the Grand Prairie Levee Dist., 621 So.2d 602,
603, n.2 (La.1993), cert. denied, 510 U.S. 1093, 114 S.Ct. 925 (1994). The supreme
court defined batture for the purposes of exemption from compensation as “alluvial
accretions annually covered by ‘ordinary high water,’ the highest stage the river can
be expected to reach annually in seasons of high water.” Id. at 604. The court went
on to hold that “[o]rdinary high water” “is the highest water stage the river can be
expected to reach annually, but not the level the water reaches during major flood
events[.]” Id. at 611. The supreme court determined that evidence of the mean high
water, the average of annual river stage peaks at a given location, was compatible
with the definition of batture.
The FLD presented the testimony of three witnesses to establish how much of
the acreage was batture. Mr. Mayeaux testified that riparian property fronts on water,
in this case the Mississippi River. He testified that the property was riparian at the
time of separation from the sovereign. Charles Wilkes, an expert real estate
8
appraiser hired by the Biglanes, determined that the property fronted the Mississippi
River. Dr. Willis agreed that the property was riparian.
Mike Sorrels, chief of the hydraulics branch of the Vicksburg District Corps
of Engineers, testified that there is a river gauge on the Mississippi River in Natchez,
Mississippi, which is located on the Natchez bridge at about river mile 363.3. He
testified that gauge zero for the Natchez gauge is 17.28 feet. Mr. Sorrels explained
that gauge zero is a conversion to get from the stage reading to the actual elevation.
Mr. Sorrels testified that the Corps of Engineers keeps records of the stage readings
at the Natchez gauge in the course of its regular business.
In calculating batture, Mr. Colquette testified it was his understanding that
batture was the area on the river side of the levee that would flood two out of three
years. He stated that he got a listing of the high-water points at the Natchez gauge
from the Corps of Engineers for every year from 1960 to present. He also had the
right-of-way maps prepared by Mr. Lightsey, in addition to a digital terrain model
of the borrow pit area from the Corps of Engineers. On July 16, 2008, Mr. Colquette
calculated that the property would flood up to an elevation of 59 feet, 70.8% of the
time. Mr. Colquette explained that the water would reach 59 feet for seven out of
ten years. Mr. Colquette chose a number that was more favorable to the property
owners because he did not want any error in the data provided by the Corps of
Engineers to impact the property owners.
Mr. Colquette calculated 22.7 acres of batture in Parcel 3-3, which had a total
of 65.145 acres. He testified that he did not calculate batture in what he had been
told was the existing right-of-way. Mr. Colquette also admitted he did not physically
visit the property.
9
Using the Natchez gauge reading provided by the Corps of Engineers, Mr.
Mayeaux calculated the ordinary high-water mark to be 62.08 feet, using the
standard set forth in DeSambourg, 621 So.2d 602. He disregarded any water levels
above the flood stage of 65.27 feet. Mr. Mayeaux testified that he looked at year
1911 and years 1940 forward. Mr. Mayeaux testified that he used the Chustz
topographical survey provided to the Corps of Engineers for the project to calculate
the batture acreage.
Mr. Mayeaux used the data points that were collected in the field to regenerate
the contours. The contour data reflected that water would go behind an alluvial ridge
located on the property. Mr. Mayeaux stated that the LIDAR images from Dr. Willis
with water levels set at 59 feet and 62 feet indicated that water would get behind the
alluvial ridge toward the levee. Mr. Mayeaux testified that 13.992 acres were above
62 feet in Parcel 3-3.
Dr. Richard Kesel, an expert in the fields of physical geology, sedimentology,
and geomorphology, testified at trial. He also testified in the DeSambourg case. He
explained that you average the mean high-water mark from every year over at least
thirty or forty years, resulting in the high-water mark for the extended period of time.
Dr. Kesel also used the information provided by the Corps of Engineers. He
calculated the mean high-water mark at 62.5 feet. He testified that the borrow pit
used for the project area is totally batture. Dr. Kesel did not use the reading from
1973 because the largest number is thrown out when calculating a mean. He
explained that the Natchez gauge is located right next to this property, so no
interpolation is needed. Dr. Kesel further explained that the approach used by Mr.
Colquette was not consistent with the approach adopted by the supreme court in
DeSambourg. Using the same numbers Mr. Colquette used, but utilizing the
10
approach in DeSambourg, Dr. Kesel determined that the batture elevation would be
62.5 feet. He explained that Mr. Colquette’s approach was more favorable for the
landowner because the landowner would get paid for three additional feet. Using
the topographical maps, Dr. Kesel explained 62 feet of batture would cover the
ground up to the toe of the levee, which includes the area of the borrow pits. Dr.
Kesel also stated that it makes no difference how long the water stayed at peak
elevations because, on a big river like the Mississippi River, the water does not just
instantaneously rise and then just drop down.
The Biglanes offered the testimony of Frank Willis, an expert in civil and
environmental engineering, land surveying, geoscience, and hydrology. Mr. Willis
testified that he did not perform a batture determination. He criticized the FLD’s
three experts because they did not go to the property before analyzing the data. Mr.
Willis had no reason to doubt the reliability of the numbers from the Corps of
Engineers. He testified about going to the property in a canoe and taking pictures of
the property. The river was at 61.8 feet, and water was going through a break in the
alluvial ridge, which was sticking up. He also stated that water would get around
the alluvial ridge by flowing upstream. Although this was after the levee project
was completed, he admitted that if the water levels rise to 62 feet, there is no
impediment to the water getting all the way to the toe of the levee.
Based on the evidence in the record, we find that the trial court erred in
concluding that the FLD failed to establish that there was non-compensable batture
on the Biglane property that was used for levee purposes. Under the guidelines of
DeSambourg, the FLD established that the ordinary high-water mark is 62 feet based
upon the testimonies of Mr. Mayeaux and Dr. Kesel. Based on Mr. Mayeaux’s
11
testimony, only 13.992 acres on the alluvial ridge were not batture in Parcel 3-3.
The rest of the acreage in Parcel 3-3 was non-compensable batture.
In making its award to the Biglanes, the trial court relied on their expert,
Charles Wilkes. He testified that he was asked to make two extraordinary
assumptions when appraising the property: (1) There was no existing right-of-way
on the east levee toe on the river side, and (2) There was no non-compensable batture.
Mr. Wilkes calculated that the FLD owed the Biglanes $1,215,880.00 for 226 acres
in Parcel 3-3, $162,757.00 for 17.223 acres in Parcel 3-2, and $18,752.00 for fences
and gates, totaling $1,397,389.00. Mr. Wilkes rounded this number to
$1,397,500.00, which is what the trial court awarded.
Finding that only 13.992 acres were compensable in Parcel 3-3, we find that
the amount owed to the Biglanes for Parcel 3-3 based on Mr. Wilkes’ appraisal
would be $75,276.96. (($1,215,880.00 ÷ 226 acres = $5,380 per acre) ($5,380 x
13.992 acres = $75,276.96)). The new total would be $256,785.96. The FLD
already tendered $385,287.00. The trial court erred in awarding the Biglanes any
additional compensation.
ATTORNEY FEES AND COSTS
Finding no additional compensation is due the Biglanes, we also find that they
are not entitled attorney fees and costs pursuant to La.R.S. 38:301(C)(2)(f), which
provides for the award of attorney fees when additional compensation is awarded.
Therefore, we reverse the award of attorney fees.
In light of this court’s reversal of the award of additional compensation to the
Biglanes, the assessment of costs against the FLD is also reversed.
12
CONCLUSION
For the reasons discussed in this opinion, the judgment of April 24, 2017,
awarding additional compensation to the Biglanes is reversed. Judgment is entered
dismissing the Biglanes’ claims against the Fifth Louisiana Levee District Board of
Commissioners with prejudice. The judgment awarding attorney fees and costs to
the Biglanes on June 19, 2017, is also reversed. Costs of this appeal are assessed to
James Biglane and Charlotte Biglane Nobile.
APRIL 24, 2017 JUDGMENT REVERSED AND RENDERED; JUNE 19,
2017 JUDGMENT REVERSED.
13