STATE OF LOUISIANA
COURT OF APPEAL, THIRD CIRCUIT

22-432
consolidated with 22-406 and 22-521

LAFAYETTE CITY-PARISH
CONSOLIDATED GOVERNMENT

VERSUS

BENDEL PARTNERSHIP (A PARTNERSHIP
IN COMMENDAM), CIRCLE "A" FARM, INC.,
STACY ALBERT FARM, INC., AND
SOUTHERN ACRES, LLC

**********

APPEAL FROM THE
FIFTEENTH JUDICIAL DISTRICT COURT
PARISH OF LAFAYETTE, NUMBER C-2021-16273 “B”
HONORABLE VALERIE GOTCH GARRETT, DISTRICT JUDGE

**********

SHARON DARVILLE WILSON
JUDGE

**********

Court composed of Sylvia R. Cooks, Chief Judge, Billy Howard Ezell, and Sharon
Darville Wilson, Judges.

JUDGMENT VACATED; ORIGINAL JUDGMENT
REINSTATED AND AFFIRMED AS AMENDED;
AND REMANDED.

Pride Justin Doran
Raven C. Boxie
DORAN & CAWTHORNE, PLCC
521 East Landry Street
Opelousas, Louisiana 70570
(337) 948-8008
Counsel for Defendant/Appellee/Cross-Appellant:
Bendel Partnership, A Partnership in Commendam

Sarah Harbison
PELICAN INSTITUTE OF PUBLIC POLICY
400 Poydras Street, Suite 900
New Orleans, Louisiana 70130
(504) 952-8016
Counsel for Amicus Curiae:
Institute for Justice

Christen Hebert
INSTITUTE FOR JUSTICE
816 Congress Avenue, Suite 960
Austin, Texas 78701
(512) 480-3936
Counsel for Amicus Curiae:
Institute for Justice

Michael D. Hebert
BECKER & HEBERT, LLC
201 Rue Beauregard
Lafayette, Louisiana 70508
(337) 233-1987
Counsel for Plaintiff/Appellant/Cross-Appellee:
Lafayette City-Parish Consolidated Government

Gregory J. Logan
Lafayette City-Parish Attorney
THE LOGAN LAW FIRM
700 Jefferson Street
Lafayette, Louisiana 70505
(337) 406-9685
Counsel for Plaintiff/Appellant/Cross-Appellee:
Lafayette City-Parish Consolidated Government

Camille Bienvenu Poche’
Karen T. Bordelon
BABINEAUX, POCHÉ, ANTHONY & SLAVICH, LLC
Post Office Box 52169
Lafayette, Louisiana 70505-2169
(337) 984-2505
Counsel for Plaintiff/Appellant/Cross-Appellee:

Lafayette City-Parish Consolidated Government

Randall A. Smith
L. Tiffany Hawkins
SMITH & FAWER, LLC
201 St. Charles Avenue, Suite 3702
New Orleans, Louisiana 70170
(504) 525-2200
Counsel for Defendant/Appellee/Cross-Appellant:
Bendel Partnership (A Partnership in Commendam)

Omar J. Thibeaux
THE THIBEAUX FIRM
400 E. Kaliste Saloom Road, Suite 3200
Lafayette, Louisiana 70508
(337) 453-4663
Counsel for Plaintiff/Appellant/Cross-Appellee:
Lafayette City-Parish Consolidated Government

WILSON, Judge.

In this expropriation proceeding, both the landowner, Bendel Partnership, A

Partnership in Commendam (Bendel), and expropriating authority, the Lafayette

City-Parish Consolidated Government (LCG), appeal multiple rulings from the

trial court, which dismissed the expropriation petition, reserved the landowner’s

claims for attorney’s fees and damages, and omitted an award of costs to the

landowner. For the reasons that follow, we find no manifest error in the trial

court’s granting the motion to dismiss. However, we vacate the trial court’s May

26, 2022 judgment and reinstate the May 4, 2022 judgment and amend it to include

the following language: “Bendel Partnership’s rights regarding any claims for

attorney’s fees and/or damages are hereby reserved.” The matter is remanded for

further proceedings consistent with this opinion.

I.

ISSUES

LCG argues that the trial court erred in granting Bendel’s motion for partial

new trial, in rendering an amended judgment, and in issuing supplemental reasons

for ruling without conducting the requisite contradictory hearing on Bendel’s

purported right to a partial new trial and without specifying its reasons for granting

the motion. LCG also argues that the trial court erred in failing to limit its review

to the question of whether LCG acted arbitrarily, capriciously, or in bad faith and

in applying an elevated standard of care to LCG’s determination of public

necessity. In the alternative, LCG asserts that the trial court’s findings of fact in

holding that LCG acted arbitrarily, capriciously, or in bad faith are manifestly

erroneous.

Bendel asserts that the trial court erred in failing to either grant or reserve its

claims for damages and attorney’s fees in its May 4, 2022 judgment; in omitting an

award of costs in its May 26, 2022 judgment; and in finding that LCG was required

to meet its burden of proving an abuse of discretion by clear and convincing

evidence.

II.

FACTS AND PROCEDURAL HISTORY

On December 6, 2021, pursuant to La.R.S. 19:139, et seq., LCG filed a

petition for expropriation against Bendel. Bendel is the owner of approximately

372.21 acres of immovable property located in Section 82, Township 10 South,

Range 4 East and Sections 5, 38, 39 and 42, Township 11 South, Range 4 East in

Lafayette Parish, Louisiana (the Bendel Property).1 LCG sought to expropriate the

Bendel Property for the construction of four (4) detention ponds, known as the

Homewood Drive Detention Pond Project (the Homewood Project),2 for the stated

purpose of “the improvement of drainage, as well as protection and public safety

from flooding in Lafayette Parish, Louisiana.” LCG had made a formal offer to

purchase the Bendel Property for $2,580,000.00 on September 17, 2020.

The following documents were attached to the petition: (1) the legal

description of the Bendel Property; (2) a certified copy of the ordinance declaring

that Homewood Project was a public necessity and authorizing expropriation of

property for that purpose; (3) a certificate signed by Pamela Gonzales Granger

(Granger), the supervising engineer, declaring that she had “fixed the right-of-way

1
The Bendel Property was being actively farmed pursuant to a sugar cane farm lease to
Circle “A” Farm, Inc., that was effective from February 1, 2019, through January 31, 2023.
2
The Project was declared a public necessity by the Lafayette City Council and the
Lafayette Parish Council under Joint Ordinance No. JO-012-2021 on March 23, 2021.

2

for the Project in a manner sufficient in my judgment to provide for the public

interest, safety, and convenience, and further, location and design of the Project are

in accordance with the best modern practices adopted in the interest of safety and

convenience of the public[;]” (4) an itemized statement of loss/damage by an

appraiser that estimated just compensation at $2,580,000.00; (5) a letter to Bendel

notifying it of the intent to expropriate the Bendel Property and return receipts of

delivery; and (6) a memo from Granger that outlined the due diligence modeling

and evaluation (the McBade memo).

On December 7, 2021, the district court signed an order declaring the Bendel

Property taken for the Homewood Project. Pursuant to the order, LCG deposited

$2,580,000.00 in to the registry of the court on December 8, 2021. On December

14, 2021, Bendel filed an ex parte motion seeking to withdraw the funds from the

registry of the court. LCG would later file an opposition to that motion.

Then, on December 23, 2021, pursuant to La.R.S. 19:139.5, Bendel filed a

motion to dismiss the expropriation petition. The motion to dismiss alleged that:

(1) the Bendel Property was not being taken for a valid public use; (2) more

property was expropriated than was needed for the Homewood Project; and (3)

Bendel was entitled to attorney’s fees, costs, and damages for the period during

which LCG possessed the Bendel Property. The hearing on the motion to dismiss

began on March 17, 2022. On March 18, 2022, Bendel moved for a continuance of

the hearing. LCG opposed the continuance.

On March 23, 2022, the trial court signed an order that: (1) continued the

hearing to April 6, 2022; (2) enjoined all work on the Bendel Property until 5:00

p.m. on April 6, 2022; and (3) authorized Bendel to withdraw $500,000.00

3

(representing a portion of the $2,580,000.00 deposited by LCG) from the registry

of the court.

At the conclusion of the hearing on April 6, 2022, the trial court took the

matter under advisement. On May 4, 2022, the trial court issued written reasons

and signed a judgment dismissing the petition for expropriation and ordering that

all work cease immediately. The trial court cast LCG with all costs.

On May 13, 2022, Bendel filed a motion for partial new trial, seeking that

the trial court modify its judgment to provide for the reservation of its claims for

attorney’s fees and damages. Without a hearing, the trial court issued an amended

judgment on May 26, 2022. This judgment dismissed the petition for

expropriation but “expressly reserve[d] Defendant’s rights regarding any claims for

attorney’s fees and damages" and provided the trial court would “entertain any

motions regarding the same.” Then, on May 31, 2022, the trial court issued

supplemental written reasons for ruling, which explained its reference, in its

original written reasons for judgment, to a deposition that was not introduced into

evidence.

Additionally, on May 31, 2022, the trial court issued an order stating that no

rule to show cause was necessary on Bendel’s motion for partial new trial. On

June 2, the trial court marked “DENIED” across the rule to show cause submitted

by Bendel with its motion for partial new trial and referenced “SEE ALTERNATE

ORDER[.]” It is unclear whether this reference is to the May 26, 2022 amended

judgment or the May 31, 2022 order.

LCG sought writs on the trial court’s granting of Bendel’s motion for partial

new trial. LCG also filed a devolutive appeal of the May 4 and May 22, 2022 final

4

judgment and related interlocutory orders. Bendel filed a devolutive appeal with

respect to the May 4, May 26, May 31, and June 1, 2022 judgments.

On July 25, 2002, this court issued a ruling granting LCG’s writ application

for the limited purpose of ordering the consolidation of the writ application with

LCG’s pending appeal. Lafayette City-Par. Consol. Gov’t v. Bendel P’ship, 22-

406 (La.App. 3 Cir. 7/25/22) (unpublished writ decision). Bendel’s appeal was

consolidated with LCG’s appeal and writ application by order of this court signed

on September 1, 2022. The Institute of Justice (IJ) filed an amicus curiae brief in

support of Bendel.

III.

STANDARD OF REVIEW

“Whether the expropriator’s purpose is public and necessary is a judicial

determination that will not be reversed on appeal absent manifest error. In the

context of expropriation, ‘necessary’ refers to the necessity of the purpose for the

expropriation not the necessity for a specific location.” ExxonMobil Pipeline Co. v.

Union Pac. R.R. Co., 09-1629, p. 12 (La. 3/16/10), 35 So.3d 192, 200 (citations

omitted). “[T]he extent and location of the property to be expropriated are within

the sound discretion of the body possessing the power of eminent domain, and

those determinations will not be interfered with by the courts if made in good faith.”

Calcasieu-Cameron Hosp. Serv. Dist. v. Fontenot, 628 So.2d 75, 78 (La.App. 3 Cir.

1993), writ denied, 94-168 (La. 3/18/94), 634 So.2d 854 (emphasis in original). A

trial court’s finding that the expropriating authority acted in bad faith or arbitrarily

and capriciously is subject to the manifest error standard of review. State, Dept. of

Transp. & Dev. v. Est. of Griffin, 95-1464 (La.App. 1 Cir. 2/23/96), 669 So.2d 566.

5

LCG argues, however, that it is entitled to a de novo review of the record,

alleging that the trial court’s judgment is premised upon an incorrect legal standard.

LCG argues that the trial court placed the burden of proof on LCG to show that it

acted in good faith rather than on Bendel to show that LCG acted in bad faith.

“Placing the burden of proof on the wrong party is a legal error that interdicts the

fact-finding process because it casts a more onerous standard than the law requires

on one of the parties.” Breaux v. Pickett, 22-19, p. 2 (La.App. 3 Cir. 5/25/22), 340

So.3d 196, 198, writ denied, 22-985 (La. 10/12/22), ___ So.3d ___. As explained

below, we find no legal error by the trial court, and our review is subject to the

manifest error standard of review.

IV.

LAW AND DISCUSSION

Motion to Dismiss Expropriation Petition

As this court recently recognized in Lafayette City-Parish Consolidated

Government v. Lucile B. Randol Heirs, LLC, 21-778, pp. 6-7 (La.App. 3 Cir.

8/3/22), ___ So.3d ___, ___, writ denied, 22-1533 (La. 12/6/22), ___ So.3d ___:

[P]rivate property is subject to expropriation by a public entity when it
is needed “for public purposes” and when just compensation is paid to
the owner. La.Const. art. 1, § 4(B)(1). A drainage project intended
for the “benefit of the public generally[,] counts as a “public purpose”
pursuant to La.Const. art. 1, § 4(B)(2)(iii).

The right of the LCG to expropriate private property for
drainage purposes by a declaration of taking is set forth in Part III-I of
Title 19 of the Louisiana Revised Statutes.

“[T]he expropriating agency must show by a preponderance of the evidence

a public need or interest in the expropriation.” Recreation & Park Comm’n for Par.

of E. Baton Rouge v. C&S Dev., Inc., 97-2652, p. 3 (La. 7/8/98), 714 So.2d 706,

707 (footnote omitted). When this burden is met, “the burden shifts to the

6

defendant to show that the agency has abused its discretion in selecting the site to

be expropriated.” Id.

In Lucile B. Randol Heirs, ___ So.3d at ___, we quoted the following

language from Calcasieu-Cameron Hosp. Serv. Dist., 628 So.2d at 79:

Criteria to be considered by the expropriator include the availability of
an alternate route, costs, environmental factors, long-range area
planning, and safety considerations. The expropriating agency may
abuse its discretion by acting without considering and weighing the
relevant factors, that is, by acting arbitrarily. Red River Waterway
Comm’n. v. Fredericks, 566 So.2d 79 (La.1990), and authorities cited
therein. However, the mere availability of a feasible alternative
location is not, by itself, an indication that the expropriator has acted
arbitrarily or capriciously in making its selection. Faustina Pipe Line
Co. v. Levert–St. John, Inc., 463 So.2d 964 at 969 (La.App. 3d Cir.),
writ denied, 466 So.2d 1301 (La.1985), quoting Louisiana Resources
Co. v. Stream, 351 So.2d 517 (La.App. 3d Cir.1977).

We also noted that the “seminal case on quick taking” is Red River

Waterway Commission, 566 So.2d 79. Lucile B. Randol Heirs, ___ So.3d at ___.

“[T]he party contesting the expropriation must prove by clear and convincing

evidence that the expropriating authority, ‘in selecting the location and extent of

the property to be expropriated, acted in bad faith or so capriciously or arbitrarily

that its action was without an adequate determining principle or was unreasoned.’”

Lucile B. Randol Heirs, ___ So.3d at ___, quoting Red River Waterway Comm’n,

556 So.2d at 83. Moreover, the expropriating authority benefits from a

presumption that its chosen location is the “best and most feasible[]” location for

the project. Acadian Gas Pipeline Sys. v. Nunley, 46,648, p. 10 (La.App. 2 Cir.

11/2/11), 77 So.3d 457, 463, writ denied, 11-2680 (La. 2/10/12), 80 So.3d 487.

This court also found that “‘best modern practices’ as it pertains to drainage

projects, means that an engineer should utilize the best engineering practices and

experiences in locating and constructing the drainage project, in accordance with

7

the engineer professional’s acceptable minimum standard of care.” Lucile B.

Randol Heirs, ___ So.3d at ___. The trial court found that LCG failed to comply

with the procedural requirements of La.R.S. 19:139.1(3)(b) such that its actions

were arbitrary and capricious. This court found that a de novo review of the record

was necessitated by the trial court’s misinterpretation of the term “best modern

practices” and reversed the trial court’s grant of the landowner’s motion to dismiss.

Such is not the case here, and this opinion should not be read as a disagreement

with our learned colleagues in Lucile B. Randol Heirs, ___ So.3d ___.

In this case, the trial court made a finding of fact that LCG met its burden of

proving that there was valid public purpose based on the evidence that millions of

dollars in FEMA claims were filed in Louisiana as a result of the August 2016

flood, that Lafayette Parish’s current infrastructure is built only for five-year

storms, and that the Homewood Project would alleviate flooding throughout

Lafayette Parish. The trial court also noted that Bendel produced no evidence to

suggest that flood reduction and drainage improvement would not affect the public.

That portion of the trial court’s ruling is not at issue in either LCG’s or Bendel’s

appeal. Thus, the question is whether LCG acted arbitrarily, capriciously, or in bad

faith in determining the necessity of the taking of this particular property. Despite

Bendel’s assertion to the contrary, the case law is clear that the landowner bears

the burden of proof on this point by clear and convincing evidence. See State,

Through Dept. of Highways v. Jeanerette Lumber & Shingle Co., Ltd., 350 So.2d

847 (La.1977), Red River Waterway Comm’n, 566 So.2d 79, and Lucile B. Randol

Heirs, ___ So.3d at ___.

In its May 4, 2022 written reasons for ruling, the trial court noted its

“particular concern” that the LCG expropriation of the Bendel Property lacked

8

objective analysis and peer review in that no engineering reports were submitted in

connection with the Homewood Project. The trial court then stated that:

While LCG undoubtedly conducted some analysis, data
collection, and modeling regarding the Homewood Detention Project,
the Court finds that LCG fell short of an adequate determining
principle and/or that the decision to expropriate this particular [site]
was arbitrarily determined.

....

LCG further states that it selected the Bendel [P]roperty because of its
location at the confluence of two major drainage channels, namely the
Vermilion River and the Coulee Ile de Cannes. Perhaps because of
this location, LCG then conducted further studies of the effectiveness
of the detention project only on the Bendel [P]roperty, ignoring other
possible locations, even those that were close in proximity and thus
also ideally situated near those channels. Specifically, Dr. [Emad]
Habib’s study considers only the Homewood Detention Project that is
the subject of the current location, the adjustment of spoil banks inside
the Bayou Tortue Swamp, and the construction of two detention
ponds on the main tributaries of Coulee Ile de Cannes. Further
modeling performed by LCG analyze only the Homewood Detention
Project. None of these studies consider other possible locations for
the detention ponds to the extent that the Bendel Property is
considered, which suggests to this Court that LCG decided first that it
would expropriate the Bendel Property and then conducted studies to
support the decision. Unfortunately for LCG, those after-the-fact
studies do not sufficiently justify expropriation either.

....

Had LCG adequately considered other properties, it may have realized
that the property adjacent to the Bendel Property is similarly situated
near both the Vermilion River and the Coulee Ile de Cannes and,
unlike, the Bendel Property, has a lower elevation that would be less
costly to excavate.

Additionally, though LCG characterizes the Bendel [P]roperty
as “vacant,” the fact remains that LCG has expropriated over 370
acres that has historically been used for agriculture, in addition to
pipelines and well, all important aspects of the local economy.
Although LCG has deposited the appraised value of the land in the
registry of the court, there does not appear to be any accounting of the
cost of interfering with existing farm leases and preventing future
farming on this large piece of property.

9

Further, LCG by its own admission only intends to use a total
of 90 acres for 4 detention ponds in addition to more land to be used
for a “staging area.” The staging area is only needed for the
construction of the detention ponds, and no evidence has been
presented as to the purpose of expropriating the remaining 200+ acres
of the Bendel [P]roperty. Additionally, the detention ponds and
staging area are situated in a way that the Court finds unnecessarily
extends across the depth of the Bendel Property despite the
availability of the length of the Bendel Property for such ponds and
staging area. The Court therefore finds that LCG acted without reason
and adequate determining principles with respect to the extent of the
property expropriated.

(Emphasis in original.) (Footnotes omitted.)

LCG argues that although the trial court correctly stated the burden of proof,

the trial court incorrectly placed the burden on LCG to show that its actions were

not arbitrary and capricious. In reviewing the trial court’s detailed reasons for

ruling, we cannot agree with LCG’s position. We find, as did the trial court, that

LCG did not consider the criteria set forth in Red River Waterway Commission,

566 So.2d 79.

According to LCG, it had examined the prospect of constructing detention

ponds on the Bendel Property for two years prior to the expropriation, and its own

in-house civil engineer and Floodplain Administrator, Jessica Cornay (Cornay),

had identified the Bendel Property and conducted the first hydraulic modeling of

detention ponds, which confirmed her hypothesis that the Bendel Property was a

suitable site.

Cornay testified that she used a heat map of the FEMA claims from the

August 2016 flood to identify clusters of claims. Then she began marking

locations that would benefit from detention ponds. She narrowed down locations

by considering which sites were close to the banks of a channel, sites that would

help the largest number of people, and vacant property. The sites were then

10

separated by size and some feasibility review was done. The Bendel Property was

number forty-seven on the list, but this does not mean that it was the forty-seventh

property considered by LCG. Cornay testified that it was “pretty obvious” that the

Bendel Property was an area worth looking into “just from an aerial view” because

it is on the banks of the Vermilion River and is a sizeable tract near the heart of

Lafayette. Cornay testified that she did not go to the site. Cornay testified that the

modeling for the Homewood Project showed a five-inch reduction on the

Vermilion River and impacts of twenty-five miles long. Cornay testified that at the

time the property was expropriated, there had been no soil assessments.

LCG argues that this court already confirmed that this vetting process was

“not one that was undertaken in haste or without considering and weighing all of

the relevant factors” in Lucile B. Randol Heirs, ____ So.3d at ___. In that case,

however, the testimony was that sites were vetted through hydraulic studies and

that once LCG identified potential locations, information was provided to

“Southeast Engineers, who performed hydraulic studies to determine the effect the

proposed detention ponds would have on the water surface elevation in the

adjacent channels during 10 and 50-year storms[,]” and “that of the ninety sites

identified, approximately twenty-two have proven potentially beneficial in

reducing flooding in the areas identified.” Lucile B. Randol Heirs, ____ So.3d at

___. Further, LCG specifically considered two of the ninety sites and determined

that one was better than the other due to its significantly lower elevation and the

fact that the other had baseball fields that would require a significant cost to

relocate. The property was 16.054 acres. That was not the testimony in this case.

To the contrary, only the Bendel Property was modeled in this case.

11

Dr. Emad Habib (Dr. Habib), a professor in the Department of Civil

Engineering and the Louisiana Watershed Flood Center at the University of

Louisiana at Lafayette, conducted a study commissioned by LCG and produced a

report entitled “Feasibility Assessment of Flood Mitigation measures in Vermilion

River Watershed,” dated April 2021. 3 Dr. Habib was not deposed and did not

testify at trial, but the parties stipulated to the admission of his report into evidence.

Dr. Habib’s report states that it “provides the results of modeling-based assessment

of different alternatives that are proposed for reducing flood risk within the

Vermilion Watershed.” The Watershed Flood Center had previously developed a

hydraulic model for the Vermilion River basin, and this new study utilized the

existing model to “evaluate the potential benefits and any possible consequences of

the proposed modifications including the readjusting of the heights of the spoil

banks separating the Vermilion River and the Bayou Tortue swamp, constructing

the Homewood pond, and building the two proposed detention[] ponds on the

Coulee Ile de Cannes.” The report states that “[t]he Homewood detention pond

scenario aims to reduce the maximum water stages inside the Vermilion [R]iver

through storing some of the flood waters in the pond.” In its consideration of the

Homewood pond, the report references “a farmland of about 375 acres” across the

outlet of Coulee Ile de Cannes to the east and noted that about 5.28 million cubic

yards of excavation work would be needed. The study concluded that “[t]he

Homewood detention pond reduced the maximum water stage in the Vermilion

River by an average of 0.22 ft and 0.51 ft during the May-2014 and August-2016

3
LCG notes that Dr. Habib’s report was issued after the adoption of the public necessity
ordinance but alleges that the results of his study were made known to LCG prior to the adoption
of the public necessity ordinance.

12

storms, respectively.” The report also noted that factors such as “cost and

constructability” had to be considered in determining “the most optimal and cost-

effective alternative[,]” whereas it “mainly focused on the capacity of each

scenario in reducing the flood elevation in comparison to the existing

condition (baseline) under two different storm events[.]” (Emphasis added.)

Granger4 testified that she was retained to perform modeling as part of the

ninety-day due diligence period after the adoption of the public necessity ordinance.

Granger admitted at trial that she did not select the location of the Homewood

Project, she did not select the Bendel Property, and she did not have any role in the

LCG’s determination of necessity. In the McBade Memo, Granger noted that the

preliminary planning model “did not evaluate the 10-year, 50-year and 100-year

24-hour design storm events using the Louisiana Rainfall Depth for National

Resource Conservation Service (NRCS) method of 7.8 inches, 11.1 inches and

12.6 inches respectively, commonly used to evaluate projects at the design level”

4
Bendel alleged that Granger had a conflict of interest that precluded her from testifying
because she had a financial interest in the outcome of the case. Specifically, Bendel pointed to
the contract between Granger’s firm and LCG, which provided payment for hourly work, a lump
sum payment for the engineering report, and a percentage of the construction costs that would be
paid only if the project was completed. The hearing on the motion to dismiss was recessed so
that Granger could seek an advisory opinion from the Louisiana Professional Engineering and
Land Surveying Board (LAPELS). LAPELS found that there was no conflict of interest, and the
hearing resumed on April 6, 2022.

IJ’s amicus curiae brief argues that Granger’s financial stake in the Homewood Project
violates the United States and Louisiana Constitutions, which guarantee that the government will
not deprive a person of life, liberty, or property without due process. LCG opposed the filing of
a brief by IJ and alleged that IJ had no specific interest in this case and that the issue of due
process had not been raised by the parties or considered by the trial court. This court allowed
IJ’s brief to be filed; however, we do not consider the constitutional issue since it was not raised
in the trial court. Johnson v. Welsh, 334 So.2d 395 (La.1976). Further, the trier of fact
determines how much weight to give expert testimony “based on the professional qualifications
and experience of the expert, the facts and studies upon which his opinion is based, his
familiarity with the locality of the property involved, and the possible bias of the witness in favor
of the side for whom he testifies.” W. Jefferson Levee Dist. v. Coast Quality Const. Corp., 93-
1718, p. 23 (La. 5/23/94), 640 So.2d 1258, 1277, cert. denied, Bayou Des Familles Dev. Corp. v.
W. Jefferson Levee Dist., 513 U.S. 1083, 115 S.Ct. 736 (1995).

13

and “did not evaluate localized benefits of the project.” Granger also noted that a

new HEC-RAS model needed to be created because of the “many inconsistencies

in modeling events, scenarios and outdated geometry.” So, it is clear that Granger

had some reservations about the modeling done by Cornay and that Granger

looked only at the Bendel Property. Granger estimated that the construction costs

for the Homewood Project would be about $45 million.

Granger testified that in the layout and design of the detention ponds, there

would be a two hundred and fifty to three hundred feet buffer from the Vermilion

River to the top banks of the ponds to prevent any issue associated with any

erosion that could potentially happen. Granger also testified that there was room

around each pond for maintenance and sufficient staging room. Granger said that

she had no issues with the suitability of the soil.

While Granger and Cornay reviewed Dr. Habib’s report, they were not able

to use his model. When asked if she had considered other potential locations for

the Homewood Project, Granger responded that “[w]e looked at other locations for

Coulee Ile de Cannes and also other locations. We did look at some adjacent

property locations, but none of them would result in large enough area due to

pipelines and other utilities, but we did look at several with regards to Coulee Ile

de Cannes and what are the different alternatives.” Granger stated her opinion that

to impact the entire parish, the Homewood Project, Coulee Ile de Cannes, and

Coulee Granges and Chappuis would all have to be constructed.

The trial court discounted Granger’s testimony based on its finding that her

“financial stake in the project creates a risk for biased or subjective models or

interpretation of the data produced by the model.”

14

LCG’s corporate representative, Chad Nepveaux (Nepveaux), a Public

Works Director, testified: “I cannot personally point out any specific alternate

sites. For me, alternate project sites where we are doing similar projects that are

going to work in conjunction with this particular project due to location, finding a

comparable alternative, it’s very difficult. Near impossible.” It was his opinion

that there are no alternate sites. In the 1442 deposition of LCG, Nepveaux was

asked: “What has LCG done to determine the safety of the project with the gas

line running through the property?” He responded: “At this point, I’m not aware

of any specific action taken.” Nepveaux was also unaware of any studies that had

been done to ensure that the ponds do not wind up being incorporated into the river

through erosion or because of failure of the tops of the ponds.

Bendel retained the services of Toby Fruge (Fruge), who was qualified as an

expert in civil engineering with a specialty in storm drainage. Fruge did not

conduct any hydraulic modeling of his own. Fruge’s opinion was that the models

created were based on outdated information. Fruge also testified that it was his

opinion that the McBade Memo ran afoul of standard engineering practice and that

it appeared to justify the ordinance “on the back end” because it only looked at the

project that the ordinance addresses without consideration of any alternative sites.

Fruge stated: “It does appear to me that the model[]ing was done to support that

project, not to look at what is the best possible solution, the most cost-effective

approach to solve flooding on the Vermilion river or in the area in general.”

Fruge’s testimony indicated that there “might” be better sites for the

Homewood Project:

I did look at LiDAR, and there is a site immediately adjacent to this
one, has lower elevation, that [] could be a potentially [] better site.
It’s just it was never investigated by anybody. . . . [I]t’s my opinion

15

that there are lower sites in Lafayette Parish that are more viable for a
pond just based upon elevation, location, and . . . the model[]ing. . .
There’s a possibility that the model[]ing could back it up.

In his testimony, Fruge stated that he had “no idea” how LCG chose the

Bendel Property. Fruge also testified that he had never seen a case where a

property that has never flooded was converted to purposely make it flood because

usually lower elevated property would be used so that so much excavation would

not be necessary.

Fruge’s opinion was that there was no comprehensive drainage plan or

model to show what was causing the flood risk and what the ultimate benefit of the

different recommendations (i.e., stream improvements, channel improvements,

detention ponds, and combinations thereof) would be. Fruge opined that a

comprehensive model was necessary to help make a determination of which

properties to use. Fruge also noted that the amount of soil that needed to be

removed from the Bendel Property, as noted by Dr. Habib’s report, was 528,000

loads of dump truck dirt, which was enough to fill up the Superdome three and a

half times. Fruge noted that this would increase the cost of the project and could

impact the existing infrastructure. According to Fruge, a soil report done by

McDowell indicated that the excavated dirt would be unusable since it was “muck.”

The soil report was not done until after the property was expropriated.

Fruge also testified that he had never seen a justification for Granger’s cost

estimate. He was not aware of any line item cost estimate for this project.

Granger’s estimate did not include any additional costs related to the soil analysis.

It was Fruge’s opinion that prior to taking the property, there was no sufficient cost

versus benefit analysis of the project.

16

The court found the assumptions on which the design was based were
“more likely than not . . . incorrect.” The court also was not
impressed by plaintiff’s indifference to the potentially incorrect
information after being put on notice it might be incorrect.

Even though the expropriating authority has wide discretion in
determining the necessity and extent of a taking, this discretion is not
unbridled. Our supreme court has stated “the expropriating authority
should be in a position to justify and support with cogent reasons” the
taking for an appropriate purpose. Jeanerette Lumber, 350 So.2d at
855.

The weight to be given to the testimony of experts is largely
dependent upon the facts upon which their opinions are based.
Quinones v. United States Fid. & Guar. Co., 93–1648 (La. 1/14/94),
630 So.2d 1303, 1308. Neither of plaintiff’s design engineers could
justify the data, particularly traffic count and hydraulic evaluation
used in selecting the design for this bridge. They could not identify
the source of their data, much less testify as to its accuracy. No one
who could do so testified. Had they been able to do so, this may have
been a case of manifest error. Plaintiff’s witnesses admitted if
defendants' information more accurately reflected the actual site data,
a smaller bridge design might be acceptable according to AASHTO
guidelines which could be built within the existing right of way. The
trial court was not manifestly erroneous in finding plaintiff acted
arbitrarily and capriciously.

Est. of Griffin, 669 So.2d at 570. Further, in Acadian Gas Pipeline Sys. v.

McMickens, 18-337, p. 26 (La.App. 3 Cir. 12/28/18), 263 So.3d 524, 540, this

court found that the expropriating party acted arbitrarily, capriciously, and in bad

faith where “much of the testimony . . . was self-serving in that their exploration of

actual alternative rouses was just a farce[.]”

LCG further argues that the trial court imposed a standard of scientific

certainty upon LCG and substituted its judgment for that of LCG, its elected

officials, and its engineers. LCG points to this court’s finding in Calcasieu-

Cameron Hosp. Serv. Dist., 628 So.2d 75, that the landowner did not carry its

burden of proving that the expropriator was in bad faith where there was no formal

plan for the expansion of the hospital that necessitated the taking, no design

17

consultant had been engaged, and no funding had been secured for the

improvements contemplated for the expropriated property. This court found that

“the trial judge impermissibly substituted his own judgment for that of the Hospital

District in determining that the expropriation was not necessary because there are

alternative locations available for parking.” Id. at 80.

In Calcasieu-Cameron Hosp. Serv. Dist., 628 So.2d 75, however, and

distinguishing it from the case sub judice, there was testimony that the property

was necessary for the expansion of the hospital’s power plant since there was no

other property next to the existing power plant; that the property taken was, in fact,

next to the existing power plant; that it was more economical to expropriate the

subject property than to relocate the power plant; and that the property was needed

to replace parking spots that would be lost due the expansion.

In this case, the testimony and evidence make clear that no alternate routes

were considered. The total cost of the project is unknown. Environmental factors

and long range area planning were not considered. None of the witnesses

testifying on behalf of LCG indicated that safety considerations were made

regarding the gas line that runs through the property. Based on all of these factors,

we cannot say that the trial court was manifestly erroneous in finding that LCG

acted arbitrarily and capriciously. That finding is affirmed.

Attorney’s Fees, Damages, and Costs

In its motion to dismiss the expropriation proceedings, Bendel requested that

the trial court “dismiss LCG’s Petition, order the return of the Property, and award

the landowner its attorney’s fees, costs, and any other damages that the Landowner

may have incurred as a result of the unlawful taking.” The May 4, 2022 judgment

cast LCG with costs but made no mention of attorney’s fees or damages. Bendel

18

filed a motion for partial new trial, alleging that Louisiana law mandated awards of

attorney’s fees, costs, and damages in cases of wrongful expropriation. Bendel

cites La.R.S 19:201(A), which provides:

A court of Louisiana having jurisdiction of a proceeding
instituted by any expropriating authority referred to in R.S. 19:2 shall
award the owner of any right, or title to, or interest in the property
sought to be expropriated such sum as will, in the opinion of the court,
reimburse such owner for his reasonable attorney fees, and court costs,
actually incurred because of the expropriation proceeding, if the final
judgment is that the plaintiff does not acquire at least fifty percent of
the immovable property requested in the petition for expropriation or
if the proceeding is abandoned by the plaintiff. If the expropriating
authority is the state or its political corporations or subdivisions, any
such award shall be paid from the same funds from which the
purchase price of the property would have been paid.

Without holding a contradictory hearing, the trial court signed an amended

judgment on May 26, 2022, which stated that “this Court expressly reserves

Defendant’s rights regarding any claims for attorneys’ fees and damages and will

entertain any motions regarding same.” On June 2, 2022, the trial court stamped

“DENIED” across the face of the rule to show cause submitted with Bendel’s

motion for partial new trial.

“The trial court may deny a motion for new trial ex parte without a

contradictory hearing.” Samuel v. Harris, 21-1577, p. 3 (La.App. 1 Cir. 6/3/22),

342 So.3d 1009, 1011. “The trial court’s discretion in ruling on a motion for new

trial is great, and its decision will not be disturbed on appeal absent an abuse of

that discretion.” Id. In this case, however, even though the trial court denied

Bendel’s motion for partial new trial, it issued an amended judgment that granted

the relief sought therein. Louisiana Code of Civil Procedure Article 1971 provides,

in part, that “[a] new trial may be granted, upon contradictory motion of any party

or by the court on its own motion, to all or any of the parties and on all or part of

19

the issues, or for reargument only.” “When a new trial is granted, it shall be

assigned for hearing in accordance with the rules and practice of the court.”

La.Code Civ.P. art. 1977. “[T]he trial court, having granted a new trial, erred in

rendering a judgment contrary to the first judgment without assigning the case for

hearing or argument as required by LSA-C.C.P. art. 1977.” DiVincenti v. First

Guar. Bank, 481 So.2d 712, 714 (La.1985).

On appeal, LCG argues that the trial court’s May 26, 2022 judgment is

absolutely null because it made a substantive alteration rather than merely a change

to alter the phraseology or to correct deficiencies in the decretal language as

allowed by La.Code Civ.P. art. 1951. LCG further argues that by not setting the

motion for partial new trial for hearing, the trial court “foreclosed any possibility

of thereafter awarding Bendel the relief requested.” LCG asserts that Bendel

specifically asserted its claims for attorney’s fees and damages prior to the trial on

its motion to dismiss and that the May 4, 2022 judgment’s failure to award any

amounts for attorney’s fees or damages is a rejection of those claims as a matter of

law.5 LCG argues in brief that Bendel did not reserve its rights to claim attorney’s

fees, damages, and costs, but merely reserved its rights to have those claims

quantified.

Bendel, in its own appeal, argues that if the May 26, 2022 judgment is null,

then the trial court erred in failing to reserve its rights to attorney’s fees and

damages in the May 4, 2022 judgment. Bendel asks that this court amend the May

4, 2022 judgment to include a reservation of its right to seek attorney’s fees and

5
“[I]t is well settled that when a trial court’s judgment is silent with respect to a party’s
claim or an issue placed before the court, it is presumed that the trial court denied the relief
sought.” Moore v. Moore, 12-959, p. 4 (La.App. 3 Cir. 4/10/13), 116 So.3d 18, 22, writ denied,
13-1065 (La. 6/21/3), 118 So.3d 421.

20

damages. Bendel argues that these matters were not placed before the court in its

motion to dismiss because they were premature until it was successful in having

the expropriation dismissed. Neither party presented any argument or evidence

regarding the merits of Bendel’s claims for attorney’s fees and damages. Bendel

also asserts, in its own appeal, that if the May 26, 2022 judgment is upheld by this

court, that this court should amend the May 26, 2022 judgment to include an award

of costs.

We find that the trial court’s May 26, 2022 judgment is absolutely null

pursuant to La.Code Civ.P. art. 1951. “Substantive amendments to judgments

made without recourse to the proper procedures, i.e., by way of a timely motion for

a new trial or by appeal, are absolute nullities.” Suprun v. La. Farm Bureau Mut.

Ins. Co., 09-1555, pp. 12-13 (La.App. 1 Cir. 4/30/10), 40 So.3d 261, 269. “This is

true even if the amendment merely expresses the trial court’s actual intention[.]”

Locke v. Madcon Crop., 21-382, p. 4 (La.App. 1 Cir. 12/30/21), 340 So.3d 946,

949. “The usual remedy applied by an appellate court when it finds an amendment

of substance has been made in a judgment is to annul and set aside the amending

judgment and reinstate the original judgment.” Suprun, 40 So.3d at 270.

In Vela v. Plaquemines Par. Gov’t, 00-2221, p. 31 (La.App. 4 Cir. 3/13/02),

811 So.2d 1263, 1283, writ denied, Crutchfield v. Plaquemines Par. Gov’t, 02-

1350 (La. 6/21/02), 819 So.2d 337, and writ denied, Crutchfield v. Plaquemines

Par. Gov’t, 02-1224 (La. 6/21/02), 819 So.2d 343, the appellate court amended a

trial court’s judgment on a rule to tax costs that “inadvertently” omitted an award

of legal interest that was “clearly owed on all court costs.” This court has held that

“[b]y its clear and unambiguous terms, La.R.S. 19:201 is a mandatory provision

insofar as it states that a court having jurisdiction over an expropriation proceeding

21

‘shall’ award attorney’s fees when expropriation proceedings are dismissed or

abandoned.” Town of Jonesville v. Griffing, 95-1365, p. 3 (La.App. 3 Cir. 3/6/96),

670 So.2d 737, 739, writ denied, 96-825 (La. 5/10/96), 672 So.2d 928 (emphasis in

original). But, the “right to recover attorney fees under La.R.S. 19:201 is

contingent upon either the rendition of a final judgment to the effect that the

expropriating authority cannot acquire the property, or the abandonment of the

expropriation proceeding by the expropriating authority.” St. Tammany Par. Hosp.

Serv., Dist. No. 2 v. Schneider, 96-2798, p. 4 (La.App. 1 Cir. 2/20/98), 707 So.2d

156, 157. The jurisprudence has further defined a general rule that “absent a

finding of bad faith or abuse, no damages are warranted when an expropriation suit

by ordinary proceeding has been commenced, and later dismissed or abandoned

under timely and appropriate circumstances.” St. Tammany Par. Hosp. Serv., Dist.

No. 2 v. Schneider, 00-247, p. 10 (La.App. 1 Cir. 5/11/01), 808 So.2d 576, 585.

Accordingly, we find no merit to the LCG’s assertion that Bendel is

precluded from seeking to recover attorney’s fees and damages. We deem it just,

legal, and proper based on the record in this case to amend the May 4, 2022

judgment to include a reservation of Bendel’s right to seek attorney’s fees and

damages.

V.

CONCLUSION

The trial court’s amended judgment dated May 26, 2022, is hereby vacated

as absolutely null. We reinstate the trial court’s May 4, 2022 judgment granting

the motion to dismiss filed by Bendel Partnership (A Partnership in Commendam),

and amend it to include the following language: “Bendel Partnership’s rights

regarding any claims for attorney’s fees and/or damages are hereby reserved.”

22

This matter is remanded to the trial court for further proceedings consistent with

this opinion. The Lafayette City-Parish Government is cast with all costs of this

appeal.

JUDGMENT VACATED; ORIGINAL JUDGMENT REINSTATED
AND AFFIRMED AS AMENDED; AND REMANDED.

23