CA-0017-0900 Nonprecedential Affirmed Processed

Joe Richard v. Eugene Guillotte

Louisiana Court of Appeal, Third Circuit · Filed March 14, 2018

Authorities cited

Identified automatically; this list may not be exhaustive.

Opinion text

STATE OF LOUISIANA
COURT OF APPEAL, THIRD CIRCUIT

17-900

JOE RICHARD

VERSUS

EUGENE GUILLOTTE

**********

APPEAL FROM THE
SIXTEENTH JUDICIAL DISTRICT COURT
PARISH OF IBERIA, NO. 128418
HONORABLE ANTHONY THIBODEAUX, DISTRICT JUDGE

**********

SHANNON J. GREMILLION
JUDGE

**********

Court composed of Marc T. Amy, Shannon J. Gremillion, and Candyce G. Perret,
Judges.

AFFIRMED.

Michael W. Campbell
Caffery, Oubre, Campbell & Garrison, L.L.P.
100 E. Vermilion St., Suite 201
Lafayette, LA 70501
(337) 232-6581
COUNSEL FOR PLAINTIFF/APPELLANT:
Joe Richard

Leon J. Minvielle, III
Haik, Minvielle & Grubbs
P. O. Box 11040
New Iberia, LA 70562-1040
(337) 365-5486
COUNSEL FOR DEFENDANT/APPELLEE:
Eugene Guillotte

GREMILLION, Judge.

The plaintiff/appellant, Joe Richard, appeals the trial court’s judgment

awarding him $500 and court costs. For the following reasons, we affirm.

FACTUAL AND PROCEDURAL BACKGROUND

Richard is the owner of a metal building located in New Iberia, Louisiana,

which was leased to the defendant/appellee, Eugene Guillotte, for a period of about

fifteen years ending in November 2015. Guillotte operated a collision repair and

auto sales shop. In January 2011, a fire accidentally occurred in the building when

a truck floorboard ignited from sparks emitted while Guillotte was welding.

Richard filed a petition for breach of contract on rent agreement in June

2016, alleging that Guillotte owed him $1,734.75 for the removal of a sign,

$6,792.00 for a damaged overhead door, $36,780.00 for replacement of a metal

roof and metal walls, and $966.00 in back rent.

Following an April 2017 trial, the trial court awarded Richard $500.00 for

remaining smoke damage related to the welding fire and cast him with all court

costs. Richard now appeals. For the following reasons, we affirm.

ASSIGNMENTS OF ERROR

1. The trial court’s denial of awarding Appellant the property
damages resulting from the fire in the amount of $36,780.00 was
manifest error and clearly wrong.

2. The trial court’s award of only $500.00 in damages to the
Appellant was manifest error and clearly wrong.

3. The manifest error and clearly wrong Judgment of the trial
court warrants a de novo review of the record which supports a
finding of liability and damages in favor of Appellant with Appellee
to pay all court costs.

DISCUSSION

Manifest Error

The supreme court summarized the manifest error standard of review:

This court has announced a two-part test for the reversal of a
factfinder’s determinations: (1) the appellate court must find from the
record that a reasonable factual basis does not exist for the finding of
the trial court, and (2) the appellate court must further determine that
the record establishes that the finding is clearly wrong (manifestly
erroneous). See Mart v. Hill, 505 So.2d 1120, 1127 (La.1987). This
test dictates that a reviewing court must do more than simply review
the record for some evidence which supports or controverts the trial
court’s findings. See id. The reviewing court must review the record
in its entirety to determine whether the trial court’s finding was
clearly wrong or manifestly erroneous. See id.

Lobell v. Rosenberg, 15-247 p. 10 (La. 10/14/15), 186 So.3d 83, 90.

A trial court is in a better position to make credibility determinations as it

has the benefit of examining the nuances of a witness’s testimony and demeanor.

Lopez v. Lopez, 00-660 (La.App. 3 Cir. 11/2/00), 772 So.2d 364.

The trial court set forth oral reasons for its findings at the conclusion of trial.

First, it found no rent was due because it had been paid through October 15, 2015,

with the rent for the month of November having been bartered for a clear coat

application by Guillotte to a car owned by Richard. Therefore, the claim for back

rent was dismissed. The trial court further found that the damages to the overhead

door pre-existed the fire based on the testimony, the chain system used to raise and

lower it, and the “constant” calls to have it repaired. Therefore, damages related to

the overheard door were dismissed as the trial court found “they probably existed

prior to the Guillottes taking possession of the place.” Relating to the sign, the trial

court found Richard failed to prove that it was not a gift given to Guillotte by

Richard. Therefore, it dismissed any claims relating to the sign.

2

Relating to the smoke damage, the trial court found:

[T]here’s no doubt that the cause of any damages to this building,
the remainder of it . . . the fire damage . . . was definitely caused by
Eugene Guillotte welding on a vehicle inside that building for its
intended purposes, okay? . . .[T]he vehicle overheated, and it
caught on fire, and that’s what caused the damages to the building[.]

....

The court finds that the condition of the building, as
demonstrated in Defendant’s Exhibit 1, is the manner in which it
was as of November 15, 2015, the day that the Guillottes exited the
building in question. The lighting was repaired, and the building
was pressure-washed. It looks like the entire – that entire section
of that building did receive some soot damage to the – probably to
the inside of the whole building, the purlings, the rafters, the plastic
that holds up the – that rests on the purlings which holds up the
insulation. Exhibit 9 reflects it very well . . . and P-7 and P-8. P-8
shows the damage to the lighting. Exhibit 9 shows the lighting
repaired.

Defense Exhibit Number 1 shows the lighting repaired and
soot removed from the rafters and the purlings and from the walls
and from the plastic leaving – there’s a little bit of gray on that
plastic[.] . . .

....

I’m going to assess you at $500 cost for leaving that gray on
that plastic, okay, because you messed up the aesthetics of the
building. Even though it is an industrial building for mechanic
work, okay, it should still look pretty, because mechanics are
people too.

....

James Stewart testified he did the assessment. The estimate
of the damage is $36,378. And since then, the materials to repair
the building have increased by eight percent. He inspected the
building in March of 2016. He personally physically inspected the
building and found heat damage to the roof. He has no idea if it
was leaking. He doesn’t know if the building itself had burned. . . .
The area that needed replacement of roof materials was put in the
quote. He never visited the building before 2016.

He did testify that the structure underneath the metal
structure, the purlings and I guess the rafter beams, structural –
eave struts, that’s what they call them – needed to be replaced,
because they got so hot the paint melted on them.

3

He also testified that the metal on top of the roof –
remove and replace thirty-two feet by two hundred twenty-five
foot roof with new three-inch insulation and twenty-six gauge RP
galvalume aluminum in the amount of $21.600 – that was damaged
by the fire.

I don’t understand – but I see no evidence of that other than
his testimony. I’ve seen no photographs of damage to the metal. I
find it hard to believe that the metal could be damaged, but the
plastic underneath it was not damaged. But yet, then again, the
purlings and the struts that were holding up the plastic got so hot
the paint melted on them. But yet the plastic was not damaged. I
find that incredible.

It says the front wall – needed to replace thirty-one sheets
and the door trim on the OHD, $3,200. No, it just needs to be
pressure-washed.

Same thing for the back wall. Replace seventy-five sheets in
the amount of $7,655. What were the sheets made of? What type
of material?

Inside first bay, purlings and eave struts, $4,325. I don’t see
where there’s a need for that.

I do not give this man any credibility whatsoever. He
certainly didn’t develop his report. I don’t know what type of
materials that needed to be used to replace thirty-one sheets and
door trim on the front wall. If plastic didn’t melt, what happened –
what caused – and what kind of damage was that? Smoke damage.
And that’s been cleaned with a pressure washer.

So I’m denying his claim for damages which he’s seeking,
the $36,780 for damages to the building.

And he says on redirect the building probably leaks, because
the neoprene washer between the screw that pushes down the metal
onto the purlings or the struts, okay, the neoprene washer would
have melted. If the building would have melted, well, the washer
would have melted. So he assumes that the washer melted, and it
would cause a lot of water damage and leaking constantly. The
testimony is, since that date – I didn’t hear testimony from the
owner that the roof leaked. And I heard testimony from the
defendant and his sister that he called as a witness; the roof never
leaked. So his credibility with me is not doing well. . . . So I
discount his report completely.

The following testimonial evidence was presented at trial:

4

Guy Bonin

Bonin, the Iberia Parish Fire Chief, testified that he arrived at the scene of

the fire at Gene’s Collision in January 2011. He noted damage to a truck, car, and

the building itself. Bonin said there was smoke damage and heat damage to the

metal because “the metal may have been buckled a little bit on the roof top.”

However, he did not inspect the roof.

Corey Leblanc

Leblanc, a captain in the Iberia Parish Fire Department, was also on scene

the day of the fire. His report noted that the department “[f]ound heavy smoke

showing from a metal building with vehicle fully engulfed.” He described the

damage as smoke damage except for the metal roof immediately above the car that

was engulfed, which suffered heat damage. Leblanc, however, did not conduct an

inspection of the roof and did not recall if there was insulation below the roof line.

Michael Vincent

Vincent, a deputy fire chief with the Iberia Parish Fire Department, testified

that upon arrival “They had a couple of vehicles on fire, a lot of black smoke

coming out the building from open garages.” He said he noticed the heat damage

on the interior ceiling.

James Stewart

Stewart, the owner of Iron Man Construction, testified that he builds

warehouses, car dealerships, churches, and the like and has been in business for

thirty-two years. He has thirty-four employees. He testified that he has built metal

buildings such as the one involved in this case. Stewart was admitted by the trial

court as an expert in the field of construction of metal buildings.

5

Stewart inspected the building in March 2016, more than five years after the

fire. Stewart testified the building needed “thirty-two foot by two hundred and

twenty-five foot of roof with new insulation and twenty-six gauge r-panels

galvalume which is unpainted.” Stewart said the front wall would need thirty-one

sheets and new door trim. 1 The back-wall replacement would be seventy-five

sheets. He further opined that the first three bays of purlings and eave struts

needed to be replaced because they were warped from the fire damage. Stewart

opined that all of the repairs were necessitated by the smoke damage that occurred

in 2011 and would cost $36,780.00.

Stewart reviewed numerous pictures submitted into evidence and described

smoke damage on the roof interior and smoke damage on the bay doors on the

exterior. He said he personally inspected the roof and there was “heat damage.”

He had no idea if the building leaked or if the building itself burned. Stewart

testified that in the first three bays, the panels had warped like the iron below but

that the screws on top of the roof are made of neoprene and would melt. He said it

probably leaks horribly but he had not been there when it was raining so he did not

know.

Joe Richard

Richard testified that after Guillotte’s departure in November 2015, the

building was rented to a Mr. Flores, but he was only open for business for five or

six months. He said no one had rented the building since. Richard said the fire

occurred in the first bay, but the ceiling damage extended the entire 225-foot

length of the shop. However, when questioned if the ceiling caught on fire, he did

not know. The trial court questioned Richard about the difference in smoke

Stewart did not actually describe what kinds of “sheets” he was referring to although we
1

assume he is referring to sheets of metal. Galvalume is a brand name of aluminum-coated steel.
6

damage and fire damage. Richard stated that “it burnt all the insulation. And if

you look very closely, all the seams on the insulation are all burnt up.” Although

Richard repeatedly commented that the building suffered fire damage, he was

questioned:

Q. But my question is: When you say that it’s fire damage, you’re
not saying it was actually burned. You’re saying that some of that
was burned or melted from heat, but some of it was also from smoke?

A. Right. The whole building didn’t get burnt. That’s why the man
said, Door One, Two, and Three, he bidded on. It didn’t burn all the
way to the very end, but it damaged enough for one, two, three bays.
Richard then testified to other damages he claimed to the building, including

what he thought was a cut to an overhead door from a forklift. Pictures were

introduced, which Richard claimed he took on the day of the fire. Next, he

discussed the sign on the side of the building that said “Guillotte’s Collision

Repair.” Richard said he owned the sign because he paid someone to create it

before Guillotte moved in. He said Guillote took it and has never brought it back.

Richard claimed the five-year-old building had been in “tiptop shape” when

Guillotte moved in.

Richard discussed some pictures of the interior ceiling that he took the day

of the fire, which showed a layer of thin plastic then insulation. Defense counsel

questioned Richard as to why the plastic protection was not melted if the fire was

so hot. Richard testified, “If you go visually look at it, you would have to say

different, if you go physically and look at it.” Then he stated, “They actually have

some pictures on the very corner where it busted through the – the insulation is

coming out on some of them pictures way over there.” However, these pictures he

referenced were not submitted into evidence because they are “just some little side

pictures,” and they were “trying to save on the amount” and “spare the court of

looking at more photographs.”

7

Richard was then presented with pictures evidencing unrepaired water

damage in the bathroom and admitted he never had it fixed.

Eugene Guillotte

Guillotte testified that he is the owner of Gene’s Collision Repair and Auto

Sales, which was previously Guillotte’s Collision Repair when he and his father

rented the building from Richard. However, a few months later Guillotte took over

the business.

Guillotte testified that in 2002, when he first rented the building, Richard did

not require a deposit because there were minor repairs that Guillotte himself

undertook before moving in. Guillotte discussed the sign, which he said was a

housewarming gift. He said “If it wasn’t a gift, I wouldn’t have taken it. I don’t

steal anything.” He further said that the police determined that it was a gift, and he

was not required to give it back. Regarding the overhead door, Guillotte said that

its problems preexisted him taking over the building and that they were always

working on it because the chain was constantly coming off. He said they had to

climb on top the building and risk injury in order to fix it themselves because

Richard would not perform any repairs.

Guillotte said that they were open for business the day after the fire occurred.

When shown the pictures presented by Richard, Guillotte testified:

Q. I’m going to show you Plaintiff’s Exhibits 7, 8, and 9. Does that
adequately reflect or accurately reflect the smoke damage to the
ceiling area?

A. Everything looks- it looks- from the smoke damage, yes, except
for this insulation hanging. That wasn’t like that when we moved out
of there.

....

Q. He says that picture was taken the day of the fire.

8

A. You can tell this right here is fresh. The yellow insulation is really
bright.

Guillotte then pointed out that two of the pictures that Richard claimed to

have taken on the day of the fire were inconsistent because one depicted an

“Interstate Batteries” sign, which Guillotte said he only took when he left in

November 2015.

Guillotte said the roof has never leaked and that he would have known if it

did because a leaky roof would not have worked in his business painting cars. He

then discussed a picture he took showing the car belonging to Richard that he did

the clear coat on in trade for rent. Guillotte pointed out that his “Interstate

Batteries” sign was not there because he had taken it down and that no insulation

was hanging from the ceiling in the picture. He said that after the fire, he pressure-

washed the ceiling, the roof, and the sides. He changed all of the electrical and

lighting fixtures that were damaged. He described how he tried to get the smoke

off of the clear plastic covering the insulation in the ceiling in the stall where the

fire occurred but that it would not come off despite pressure washing and bleach.

The trial court then questioned Guillotte about “some plastic coating for the

insulation heated up and kinda melted down.” Guillotte informed the trial court

that the plastics were motorcycle plastics that he had hanging in the shop and that

there were gas tanks for motorcycles, which would have blown up had the fire or

heat reached them (they were in an elevated portion of the building below the

insulation). Thus, it was not the plastic that was supporting the insulation that had

melted; rather the heat had melted some of the plastic motorcycle parts that were

hanging in the building.

9

Guillotte then testified to numerous deficiencies with the building that

Richard would not repair including termite damage that left a hole in the wall,

black mold from a leaking hot water tank, and a toilet that he replaced at his own

expense. Although Guillotte had a general liability insurance policy in effect, he

did not have a policy to cover the building, nor did Richard. However, Guillotte

said that Richard told him to get one after the fire, which he did.

Shelly Guillotte2

Shelly, Guillotte’s sister, testified that she had worked for him since 2001

doing paint and body work and sometimes helping out in the office. Following the

fire, Shelly testified that they had “a bunch of cleaning to do” and had pressure-

washed the inside “a lot” of times. She said there was a lot of black soot on the

walls. When questioned whether the insulation melted or fell down from the

ceiling, Shelly replied that it had not melted or fallen down, but that it did “have a

lot of black soot on it.” She said the light fixtures in the first two-to-three stalls

were replaced. Shelly described the location of the office as being right next to the

stall where the fire occurred. She said there was no damage to the office. She

described some of the issues with the building including termites and plumbing

issues. She said that Richard “ sometimes” fixed them.

Cindy Frederick

Frederick, Guillote’s mother, testified that she would go to the business to

help out with the books, monthly taxes, run errands, and go to the bank. Frederick

arrived on scene shortly after the fire. She said the only damage she saw was to

the two vehicles that caught fire and that the roof had black soot on it. She said

there was no insulation that was melted or falling down. She testified that the car

2
Note that we refer to Shelly by first name only to distinguish her from the Plaintiff
because they share the same last name.
10

that caught fire was probably ten to fifteen feet from the office and that they were

thankful that there was no loss of records located in the office, which had no

damage.

Based on our review of the record, we cannot say the trial court manifestly

erred as its findings are reasonably supported by the record. The trial court clearly

did not find Richard or Stewart’s testimony credible, and that finding is not

manifestly erroneous. The “expert” who testified on Richard’s behalf inspected

the building five years after the fire. He barely gave enough information for a

basic understanding of what the $36,760.00 worth of repairs was comprised, much

less connect the alleged damage to the roof to the fire on the interior that did not

even melt the plastic covering the insulation. Richard’s own inconsistencies and

the photographic evidence simply did not support his claims. In fact, his own

evidence contradicted his claims. The trial court even asked for clarification:

TC: Does anybody have a picture of the metal damage?

...

PLAINTIFF’S COUNSEL: No, sir. Joe [Richard] didn’t go up there.

TC: ‘Cause I’m trying to figure out how there’s some plastic between
the plastic and roof. And if the metal roof melted, how come the
plastic that precedes it did not? I’m having a difficult time with that.

...

TC: . . . Do y’all have any evidence about that?

PLAINTIFF’S COUNSEL: Other than the testimony of the expert,
who said he got up on the roof and it was – there was heat damage.

Richard failed to meet his burden of proving that he was owed any damages

for replacement of nearly the entire metal building. The trial court’s finding that

Guillotte owed him $500.00 for some remaining grey soot was entirely reasonable,

and we will not disturb it.

11

CONCLUSION

The judgment of the trial court awarding the plaintiff/appellant, Joe Richard,

$500 and assessing him with all court costs is affirmed. All costs of this appeal are

assessed to Joe Richard.

AFFIRMED.

12